Home › ENGINE ยท 3UR-FE › ENGINE CONTROL SYSTEM › THROTTLE BODY

THROTTLE BODY > INSTALLATION

for Preparation Click here


HINT:
Perform "Inspection After Repairs" after replacing the throttle body assembly (Click here).



1. INSTALL THROTTLE BODY ASSEMBLY

HINT:
Perform "Inspection After Repairs" after replacing the throttle body assembly (Click here).



    A313317E01
  1. Install the No. 5 water by-pass hose to the throttle with motor body assembly, and slide the clamp to secure the hose.
    Text in Illustration 
    *1
    No. 5 Water By-pass Hose
    *2
    No. 4 Water By-pass Hose
    *a
    White Mark

    HINT:
    Make sure the hose color is shown in the illustration.

  1. Install the No. 4 water by-pass hose to the throttle with motor body assembly, and slide the clamp to secure the hose.

    HINT:
    Make sure the hose color is shown in the illustration.



    A165587E03
  1. Align the protrusion of the gasket with the groove of the intake manifold.
    Text in Illustration 
    *a
    Groove
    *b
    Protrusion
    *c
    Intake Manifold Side
    *d
    Throttle Body Side

  1. Install a new gasket to the intake manifold.

  1. Install the throttle with motor body with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the throttle position sensor and control motor connector.



    A313318E01
  1. Connect the No. 5 water by-pass hose to the water inlet housing, and slide the clamp to secure the hose.
    Text in Illustration 
    *1
    No. 5 Water By-pass Hose
    *2
    No. 4 Water By-pass Hose
    *a
    Yellow Mark
    *b
    Pink Mark

    HINT:
    Make sure the hose color is shown in the illustration.

  1. Connect the No. 4 water by-pass hose to the No. 3 water by-pass pipe, and slide the clamp to secure the hose.

    HINT:
    Make sure the hose color is shown in the illustration.



2. ADD ENGINE COOLANT
  1. Add engine coolant.
    Standard capacity: 
    Item
    Specified Condition
    w/ Trailer Towing System
    13.0 liters (13.7 US qts, 11.4 Imp. qts)
    w/o Trailer Towing System
    12.1 liters (12.8 US qts, 10.6 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology is a combination of low phosphates and organic acids).
    2. Please contact your Toyota dealer for further details.



    A151850E05
  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the radiator inlet hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A161780E01
  1. Check that the coolant level is between the FULL and LOW lines.
    If the coolant level is below the LOW line, repeat all of the procedures above.
    If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.



3. INSTALL AIR CLEANER HOSE ASSEMBLY
  1. Install the air cleaner hose assembly with the 2 hose clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the vacuum hose to the air cleaner hose assembly.

  1. Connect the ventilation hose to the air cleaner hose assembly, and slide the clamp to secure the hose.



4. INSPECT FOR ENGINE COOLANT LEAK


A161766

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.



5. INSTALL V-BANK COVER SUB-ASSEMBLY


    A307791E01
  1. Attach the 2 V-bank cover hooks to the No. 1 V-bank cover bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover sub-assembly to attach the pins.
    Text in Illustration 
    *1
    V-bank Cover Grommet
    *2
    Pin
    *3
    No. 1 V-bank Cover Bracket
    *4
    V-bank Cover Hook



6. PERFORM INITIALIZATION

NOTICE:
Perform the following procedure after replacing the throttle body assembly or any throttle body assembly components. The following procedure should also be performed if the throttle body assembly is cleaned.

  1. Turn the ignition switch to ON without operating the accelerator pedal.

    NOTICE:
    If the accelerator pedal is operated, perform the above step again.

  1. Connect the Techstream to the DLC3 and clear the DTCs (Click here).

  1. Perform the "Inspection After Repairs" (Click here).

  1. Start the engine and check that the MIL is not illuminated and that the idle speed is within the specified range when the A/C is switched off after the engine is warmed up.

    Standard:
    Condition
    Engine Idle Speed
    A/C switched off
    650 to 750 rpm

    HINT:
    1. Be sure to perform this step with all accessories off.
    2. Make sure that the shift lever is in P or neutral.

  1. Enter the following menus: Powertrain / Engine and ECT / Data List / Throttle Pos. Sensor Output. Fully depress the accelerator pedal and check that the value is 60% or more.

  1. Perform a road test and confirm that there are no abnormalities.