Home › ENGINE ยท 3UR-FE › ENGINE CONTROL SYSTEM › VVT SENSOR

VVT SENSOR > INSTALLATION

for Preparation Click here



1. INSTALL VVT SENSOR


    A158607E04
  1. Install the 4 sensors with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 4 sensor connectors.



2. INSTALL AIR CLEANER HOSE ASSEMBLY
  1. Install the air cleaner hose assembly with the 2 hose clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the vacuum hose to the air cleaner hose assembly.

  1. Connect the ventilation hose to the air cleaner hose assembly, and slide the clamp to secure the hose.



3. INSTALL V-BANK COVER SUB-ASSEMBLY


    A307791E01
  1. Attach the 2 V-bank cover hooks to the No. 1 V-bank cover bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover sub-assembly to attach the pins.
    Text in Illustration 
    *1
    V-bank Cover Grommet
    *2
    Pin
    *3
    No. 1 V-bank Cover Bracket
    *4
    V-bank Cover Hook