Home › ENGINE ยท 1UR-FE › ENGINE CONTROL SYSTEM › VVT SENSOR

VVT SENSOR > INSTALLATION

for Preparation Click here



1. INSTALL VVT SENSOR


    A215432E01
  1. Install the 4 sensors with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 4 sensor connectors.



2. INSTALL AIR CLEANER HOSE ASSEMBLY


    A214569
  1. Install the air cleaner hose with the 2 clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the ventilation hose and vacuum sensing hose.



3. INSTALL V-BANK COVER SUB-ASSEMBLY


    A214821E01
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.