Home › BODY ELECTRICAL › HORN › HIGH PITCHED HORN

HIGH PITCHED HORN > INSTALLATION

for Preparation Click here



1. INSTALL HIGH PITCHED HORN ASSEMBLY
  1. Install the high pitched horn assembly with the bolt.

    Torque:
    20 N*m{ 199 kgf*cm , 14 ft.*lbf }

  1. Connect the connector.



2. INSTALL RADIATOR GRILLE SUB-ASSEMBLY
  1. Attach the 4 claws and 3 clips to install the radiator grille sub-assembly.

  1. Install the 4 screws and 2 clips.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }