Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PURGE VSV
  1. Install the purge VSV with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 purge line hoses.

  1. Connect the purge VSV connector.