Home › ENGINE ยท 1UR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 1)

AIR SWITCHING VALVE (for Bank 1) > INSTALLATION

for Preparation Click here



1. INSTALL AIR SWITCHING VALVE ASSEMBLY


    A307651E02
  1. Install a new gasket and the air switching valve assembly with the 3 bolts.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

    Text in Illustration 
    *1
    Air Switching Valve Assembly
    *2
    No. 4 Air Tube
    *a
    Claw

    NOTICE:
    Make sure the gasket's claws are not caught between the air switching valve assembly and No. 4 air tube.



    A307649
  1. Install the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the wire harness clamp bracket to the cylinder head cover sub-assembly LH with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



2. CONNECT NO. 2 AIR HOSE


    A307652E02
  1. Align the paint mark with the projection and connect the No. 2 air hose, and slide the clamp to secure the hose.
    Text in Illustration 
    *a
    Paint Mark
    *b
    Projection

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the air switching valve assembly connector.