Home › ENGINE · 1UR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 1)

AIR SWITCHING VALVE (for Bank 1) > INSPECTION

for Preparation Click here



1. INSPECT AIR SWITCHING VALVE ASSEMBLY


    A266183E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 5
    20°C (68°F)
    4.5 to 5.5 Ω
    1 - Body ground
    Always
    1 MΩ or higher
    5 - Body ground

    Text in Illustration 
    *a
    Component without harness connected
    (Air Switching Valve Assembly)

    NOTICE:
    When measuring the resistance, do not touch terminals 2, 3 or 4.

    HINT:
    When measuring the resistance, make sure that the surface temperature of the air switching valve assembly is 20°C (68°F).

    If the result is not as specified, replace the air switching valve assembly.



    A266184E02
  1. Check the operation of the air switching valve assembly.

    1. Check that air does not flow from port A to port B.
      Text in Illustration 
      *a
      Port A
      *b
      Port B
      V100135
      Air

      NOTICE:
      Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.

      If the result is not as specified, replace the air switching valve assembly.



    2. A266185E02
    3. Apply battery voltage across terminals 1 and 5.
      Text in Illustration 
      *a
      Component without harness connected
      (Air Switching Valve Assembly)
      *b
      Port A
      *c
      Port B
      V100135
      Air

      NOTICE:
      When applying voltage, do not touch terminals 2, 3 or 4.

    4. Check that air flows from port A to port B.
      If the result is not as specified, replace the air switching valve assembly.