Home › ENGINE ยท 3UR-FE › INTAKE › INTAKE MANIFOLD

INTAKE MANIFOLD > INSTALLATION

for Preparation Click here



1. INSTALL UNION TO CONNECTOR TUBE HOSE
  1. Install the 2 wire harness clamp brackets with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Install the union to connector tube hose to the intake manifold, and slide the clamp to secure the hose.



2. INSTALL PURGE VSV
  1. Connect the purge line hose to the intake manifold, and slide the clamp to secure the hose.

  1. Install the purge VSV with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



3. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
  1. Install the vacuum switching valve assembly with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 vacuum hoses to the vacuum switching valve assembly.



4. INSTALL THROTTLE BODY ASSEMBLY


    A167490E04
  1. Align the protrusion of a new gasket with the groove of the intake manifold, and install the gasket.
    Text in Illustration 
    *1
    Gasket
    *a
    Groove
    *b
    Protrusion
    *c
    Intake Manifold Side
    *d
    Throttle Body Assembly Side

  1. Install the throttle body assembly with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



5. INSTALL V-BANK COVER BOLT
  1. Install the 2 V-bank cover bolts to the intake manifold.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



6. INSTALL NO. 1 V-BANK COVER BRACKET
  1. Install the No. 1 V-bank cover bracket with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



7. INSTALL VENTILATION HOSE ASSEMBLY


    A163820E03
  1. Install the ventilation hose assembly to the intake manifold with the 2 bolts.

    Torque:
    for bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt B:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



8. INSTALL INTAKE MANIFOLD


    A162094
  1. Place 2 new gaskets on the intake manifold.

  1. Place the intake manifold on the cylinder head sub-assembly.

  1. Install and uniformly tighten the 8 bolts and 2 nuts in several steps.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the wire harness clamp bracket to the intake manifold with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Attach the 3 wire harness clamps to the 3 wire harness clamp brackets.

  1. Install the No. 1 tube with the 2 bolts.

    Torque:
    8.2 N*m{ 84 kgf*cm , 73 in.*lbf }

  1. Connect the union to connector tube hose to the No. 1 tube, and slide the clamp to secure the hose.

  1. Connect the purge line hose to the purge VSV, and slide the clamp to secure the hose.

  1. Connect the 2 vacuum switching valve connectors.

  1. Connect the ventilation hose to the intake manifold, and slide the clamp to secure the hose.

  1. Connect the 2 water by-pass hoses to the inlet water housing and front water by-pass joint, and slide the 2 clamps to secure the hose.

  1. Connect the throttle body connector to the throttle body assembly.

  1. Install the No. 3 engine cover.

  1. Install the No. 1 engine cover sub-assembly.



9. CONNECT VENTILATION HOSE ASSEMBLY
  1. Connect the ventilation hose assembly to the ventilation pipe of the cylinder head cover sub-assembly and cylinder head cover sub-assembly LH, and slide the 2 clamps to secure the hose.



10. INSTALL AIR CLEANER HOSE ASSEMBLY
  1. Install the air cleaner hose assembly with the 2 hose clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the vacuum hose to the air cleaner hose assembly.

  1. Connect the ventilation hose to the air cleaner hose assembly, and slide the clamp to secure the hose.



11. INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY
  1. Install the cowl top outer panel sub-assembly with the 7 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the washer hose and attach the 2 wire harness clamps.



12. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY
(Click here)


13. ADD ENGINE COOLANT
  1. Add engine coolant.
    Standard capacity: 
    Item
    Specified Condition
    w/ Trailer Towing System
    13.0 liters (13.7 US qts, 11.4 Imp. qts)
    w/o Trailer Towing System
    12.1 liters (12.8 US qts, 10.6 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology is a combination of low phosphates and organic acids).
    2. Please contact your Toyota dealer for further details.



    A151850E05
  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the radiator inlet hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A161780E01
  1. Check that the coolant level is between the FULL and LOW lines.
    If the coolant level is below the LOW line, repeat all of the procedures above.
    If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.



14. INSPECT FOR COOLANT LEAK


A161766

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.



15. INSTALL V-BANK COVER SUB-ASSEMBLY


    A307791E01
  1. Attach the 2 V-bank cover hooks to the No. 1 V-bank cover bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover sub-assembly to attach the pins.
    Text in Illustration 
    *1
    V-bank Cover Grommet
    *2
    Pin
    *3
    No. 1 V-bank Cover Bracket
    *4
    V-bank Cover Hook



16. INSTALL NO. 1 ENGINE UNDER COVER


    A150108
  1. Hook the engine under cover to the vehicle body as shown in the illustration.

  1. Install the 3 screws and 5 bolts.

    Torque:
    for bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for screw:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }