Home › ENGINE ยท 1UR-FE › ENGINE CONTROL SYSTEM › ECM

ECM > INSTALLATION

for Preparation Click here



1. INSTALL GASKET
  1. Clean the ECM seal's surface with non-residue solvent.

  1. Attach a new gasket to the ECM.



2. INSTALL ECM


    A155993
  1. Install the ECM with the 4 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    NOTICE:
    1. Make sure the gasket is not folded or caught on any area on the surrounding part.
    2. Make sure there is no foreign matter caught between the gasket and surrounding part.
    3. Do not damage the gasket.



    A218998
  1. Connect the 2 ECM connectors and push each lock lever down to lock the ECM connectors.

    NOTICE:
    1. Make sure that the lock lever is raised 90° before connecting the ECM connectors. Failure to do this may cause the lock lever and terminals to break.
    2. Do not twist the wire harness when connecting the ECM connectors.



    A215595
  1. Connect the wire harness clamp.



3. CONNECT CONNECTOR HOLDER BLOCK


    A215430
  1. Connect the connector holder block with the 3 bolts.

    Torque:
    7.3 N*m{ 74 kgf*cm , 65 in.*lbf }

  1. Install the connector holder block cover.



4. INSTALL AIR CLEANER ASSEMBLY
  1. Install the air cleaner assembly with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Tighten the hose clamp.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the ventilation hose and vacuum hose.

  1. Attach the clamp and connect the mass air flow meter connector.



5. INSTALL V-BANK COVER SUB-ASSEMBLY


    A214821E01
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.