AIR SWITCHING VALVE (for Bank 2) > INSTALLATION |
| 1. INSTALL AIR SWITCHING VALVE ASSEMBLY |
![]() |
Install a new gasket and the air switching valve assembly with the 3 bolts.
| *1 | Air Switching Valve Assembly |
| *2 | No. 3 Air Tube |
| *a | Claw |
![]() |
Install the 2 bolts.
Attach the wire harness clamp to the air switching valve assembly and connect the air switching valve assembly connector.
| 2. CONNECT NO. 1 AIR HOSE |
![]() |
Align the paint mark with the projection and connect the No. 1 air hose, and slide the clamp to secure the hose.
| *a | Paint Mark |
| *b | Projection |
| 3. CONNECT NO. 3 VENTILATION HOSE |
![]() |
Connect the No. 3 ventilation hose, and slide the clamp to secure the hose.
| *a | Front |
| *b | Rear |
| *c | Paint Mark |
| 4. INSTALL AIR CLEANER HOSE ASSEMBLY |
![]() |
Install the air cleaner hose with the 2 clamps.
Connect the ventilation hose and vacuum sensing hose.
| 5. INSTALL V-BANK COVER SUB-ASSEMBLY |
![]() |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.