Home › ENGINE · 1GR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 2)

AIR SWITCHING VALVE (for Bank 2) > INSPECTION

for Preparation Click here



1. INSPECT NO. 2 EMISSION CONTROL VALVE SET


    A224405E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 5
    20°C (68°F)
    4.3 to 5.8 Ω
    1 - Body ground
    Always
    1 MΩ or higher
    5 - Body ground

    Text in Illustration 
    *a
    Component without harness connected
    (No. 2 Emission Control Valve Set)

    NOTICE:
    When measuring the resistance, do not touch terminals 2, 3 or 4.

    HINT:
    When measuring the resistance, make sure that the surface temperature of the No. 2 emission control valve set is 20°C.

    If the result is not as specified, replace the No. 2 emission control valve set.



  1. Check the operation of the No. 2 emission control valve set.



      A224406E01
    1. Check that air does not flow from port A to port B.
      Text in Illustration 
      *1
      Air
      *2
      Port A
      *3
      Port B

      NOTICE:
      Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.

      If the result is not as specified, replace the No. 2 emission control valve set.



    2. A224407E01
    3. Apply battery voltage across terminals 1 and 5.

      NOTICE:
      When applying voltage, do not touch terminals 2, 3 or 4.

    4. Check that air flows from port A to port B.
      Text in Illustration 
      *1
      Air
      *2
      Port A
      *3
      Port B
      If the result is not as specified, replace the No. 2 emission control valve set.