Home › ENGINE ยท 1UR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 2)

AIR SWITCHING VALVE (for Bank 2) > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER SUB-ASSEMBLY


    A214822E01
  1. Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.



2. REMOVE AIR CLEANER HOSE ASSEMBLY


    A214569
  1. Disconnect the vacuum sensing hose and ventilation hose.

  1. Loosen the 2 clamps.

  1. Remove the air cleaner hose.



3. DISCONNECT NO. 3 VENTILATION HOSE


    A214254
  1. Slide the clamp and disconnect the No. 3 ventilation hose.



4. DISCONNECT NO. 1 AIR HOSE


    A307654
  1. Slide the clamp and disconnect the No. 1 air hose.



5. REMOVE AIR SWITCHING VALVE ASSEMBLY


    A307655
  1. Detach the wire harness clamp and disconnect the air switching valve assembly connector from the air switching valve assembly.



    A307656
  1. Remove the 2 bolts.



    A307657
  1. Remove the 3 bolts, air switching valve assembly and gasket.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.