Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 2)

AIR SWITCHING VALVE (for Bank 2) > REMOVAL

for Preparation Click here



1. REMOVE PURGE VSV
(Click here)


2. REMOVE NO. 2 AIR TUBE


    A239085
  1. Remove the 2 bolts, 2 nuts and No. 2 air tube.

  1. Remove the 2 gaskets from the No. 2 air tube.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.



3. DISCONNECT WIRE HARNESS


    A239084
  1. Detach the 3 clamps and disconnect the wire harness.

  1. Remove the bolt and bracket.



4. REMOVE NO. 2 EMISSION CONTROL VALVE SET


    A239086
  1. Disconnect the No. 2 emission control valve set connector.

  1. Disconnect the air hose.



    A239087
  1. Remove the 3 nuts and No. 2 emission control valve set.