Home › ENGINE ยท 1GR-FE › INTAKE › INTAKE MANIFOLD

INTAKE MANIFOLD > INSTALLATION

for Preparation Click here



1. INSTALL INTAKE MANIFOLD


    A221467
  1. Set a new gasket on each cylinder head.

    NOTICE:
    1. Align the port holes of the gasket and cylinder head.
    2. Be careful of the installation direction.

  1. Set the intake manifold on the cylinder heads.



    A221466E01
  1. Install and uniformly tighten the 6 bolts and 4 nuts in several passes.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    Text in Illustration 
    *1
    Nut

    HINT:
    Tighten the inner installation bolts of the intake manifold before tightening the outer bolts.



2. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
  1. Place the fuel delivery pipe together with the 6 fuel injectors on the intake manifold.

  1. Temporarily install the 4 bolts, which are used to hold the fuel delivery pipe in place, to the intake manifold.



    A239745
  1. Check that the fuel injectors rotate smoothly.
    Text in Illustration 
    V100135
    Turn
    If a fuel injector does not rotate smoothly, replace its O-ring.

  1. Position the fuel injectors with the connectors facing outward.

  1. Tighten the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the 6 fuel injector connectors.



3. INSTALL INTAKE AIR SURGE TANK
  1. Install a new gasket to the intake air surge tank.



    A221465E04
  1. Install the intake air surge tank with the 4 bolts and 2 nuts in the order shown in the illustration.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

    Text in Illustration 
    *1
    Nut

  1. Install the throttle body bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the No. 1 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Attach the wire harness clamp.

  1. Install the No. 2 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A238097E01
  1. Connect the No. 1 ventilation hose.

  1. Connect the vacuum hose.

  1. Connect the No. 1 fuel feed hose.
    Text in Illustration 
    *a
    Front
    *b
    Matchmark
    *c
    Top

    HINT:
    Connect the hose so that the direction of the hose clamp is as indicated in the illustration.



    A225184E01
  1. Connect the throttle body connector.

  1. Connect the No. 4 water by-pass hose.

  1. Connect the No. 5 water by-pass hose.

    HINT:
    Connect the hose so that the direction of the hose clamp is as indicated in the illustration.

  1. Connect the 2 heater hose clamps.
    Text in Illustration 
    *a
    Front
    *b
    Matchmark
    *c
    RH



4. INSTALL AIR TUBE ASSEMBLY


    A238098E01
  1. for Bank 1 Side:
    Align the paint mark with the projection and connect the air tube assembly to the emission control valve set.
    Text in Illustration 
    *1
    Projection
    *2
    Paint Mark
    *a
    Upper
    *b
    RH Side

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.



    A238099E01
  1. for Bank 2 Side:
    Align the paint mark with the projection and connect the air tube assembly to the No. 2 emission control valve set.
    Text in Illustration 
    *1
    Paint Mark
    *2
    Projection
    *a
    Upper
    *b
    LH Side

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Install the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install the wire harness clamp bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Attach the 3 wire harness clamps to the intake air surge tank and bracket.

  1. Connect the purge VSV connector.



    A238101E01
  1. Connect the air injection system hose to the air tube assembly shown in the illustration.
    Text in Illustration 
    *1
    Paint Mark
    *2
    Projection
    *a
    Upper
    *b
    LH Side

    HINT:
    1. Make sure the paint mark of the air injection system hose is facing upward.
    2. Make sure the direction of the hose clamp is as shown in the illustration.



5. INSTALL AIR CLEANER HOSE ASSEMBLY


    A238100E01
  1. Install the air cleaner hose with the 2 clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    Text in Illustration 
    *1
    Paint Mark
    *a
    Protrusion
    *b
    Groove
    *c
    Top
    *d
    RH
    *e
    Front

  1. Connect the vacuum hose and ventilation hose.

    HINT:
    The direction of the hose clamp is indicated in the illustration.

  1. Attach the wire harness clamp.



6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).



7. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard capacity:
    10.7 liters (11.3 US qts, 9.4 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    2. Press the No. 1 and No. 2 radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Install the radiator cap.*1

  1. Start the engine and stop it immediately.*2

  1. Allow approximately 10 seconds to pass. Then remove the radiator cap and check the coolant level. If the coolant level has decreased, add coolant.*3

  1. Repeat steps *1, *2 and *3 until the coolant level does not decrease.

    HINT:
    Be sure to perform this step while the engine is cold, as air in the inlet radiator hose will flow into the radiator if the engine is warmed up and the thermostat opens.

  1. Install the radiator cap.*4

  1. Set the air conditioning as follows.*5
    Measurement Condition 
    Item
    Condition
    Fan speed
    Any setting except off
    Temperature
    Toward WARM
    Air conditioning switch
    Off

  1. Start the engine, warm it up until the thermostat opens, and then continue to run the engine for several minutes to circulate the coolant.*6

    CAUTION:
    1. Wear protective gloves. Hot areas on the parts may injure your hands.
    2. Be careful of the fan.
    3. Be careful as the engine, radiator and radiator hoses are hot and can cause burns.

    NOTICE:
    1. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.
    2. Do not start the engine when there is no coolant in the radiator reservoir.
    3. Pay attention to the needle of the engine coolant temperature receiver gauge. Make sure that the needle does not show an abnormally high temperature.
    4. If there is not enough coolant, the engine may burn out or overheat.

    HINT:
    1. Press the inlet and outlet radiator hoses several times by hand to bleed air while warming up the engine.
    2. The thermostat opening timing can be confirmed by pressing the outlet radiator hose by hand and checking when the engine coolant starts to flow inside the hose.

  1. Stop the engine, wait until the engine coolant cools down to ambient temperature. Then remove the radiator cap and check the coolant level.*7

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. If the coolant level has decreased, add coolant and warm up the engine until the thermostat opens.*8

  1. If the coolant level has not decreased, check that the coolant level in the radiator reservoir is at the FULL line.
    If the coolant level is below the FULL line, repeat steps *4 through *8.
    If the coolant level is above the FULL line, drain coolant until the coolant level reaches the FULL line.



8. INSPECT FOR COOLANT LEAK

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.



9. INSPECT FOR FUEL LEAK
  1. Make sure that there are no fuel leaks after performing maintenance on the fuel system.

    1. Connect the Techstream to the DLC3.

    2. Turn the ignition switch to ON and turn the Techstream on.

      NOTICE:
      Do not start the engine.

    3. Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.

    4. Check that there are no leaks from the fuel system.
      If there are fuel leaks, repair or replace parts as necessary.

    5. Turn the ignition switch off.

    6. Disconnect the Techstream from the DLC3.



10. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY
  1. Install the front cowl top outer panel with the 7 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the washer hose.



11. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY
(Click here)