Home › Brake › PARKING BRAKE › ELECTRIC PARKING BRAKE SYSTEM (for Gasoline Model TMC Made) › from 2021.07
RM3700E _54 Brake _093729 PARKING BRAKE _0484415 ELECTRIC PARKING BRAKE SYSTEM(for Gasoline Model TMC Made) C

PARKING BRAKE  ELECTRIC PARKING BRAKE SYSTEM(for Gasoline Model TMC Made)  C123A14  Supply Voltage Circuit IG Open  


DESCRIPTION

DTC No. Detection Item DTC Detection Condition Trouble Area Memory DTC Output from Priority Note
C123A14 Supply Voltage Circuit IG Open
·

Diagnosis Condition:

Ignition switch to ON

·

Malfunction Status:

When the ECM is communicating via CAN communication, IG power is not input to the skid control ECU (brake actuator sub-assembly).

·

Detection Time:

Approximately 15 seconds


·

Wire harness and connector

·

Skid control ECU (brake actuator assembly)


DTC stored Brake/EPB A An electric parking brake system malfunction is displayed on the multi-information display.

WIRING DIAGRAM

C419806E30
1.677,1.583 3.792,2.031 2.115,0.448 10 false ECU-IGR NO. 3 3.938,1.302 4.208,1.458 0.271,0.156 10 false 45 4.167,1.427 5.125,1.594 0.958,0.167 10 false IGR 4.031,2.104 4.427,2.313 0.396,0.208 10 false A94 4.042,2.271 5.594,2.667 1.552,0.396 10 false Skid Control ECU (Brake Actuator Assembly)

CAUTION / NOTICE / HINT

NOTICE:
·

Inspect the fuses for circuits related to this system before performing the following procedure.

·

The electric parking brake may still operate up to 20 seconds after the ignition switch is turned off. Before disconnecting connectors or fuses, turn the ignition switch off and wait 20 seconds or more.

·

After replacing the skid control ECU (brake actuator assembly), perform "Calibration".

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM (for Gasoline Model TMC Made)>CALIBRATION

·

When replacing the skid control ECU (brake actuator assembly), operate the electric parking brake switch (electric parking brake switch assembly) as the parking brake indicator light (red) blinks when the ignition switch is first turned on (IG).



PROCEDURE

1.CHECK HARNESS AND CONNECTOR (IGR TERMINAL VOLTAGE)

Pre-procedure1

a.

Disconnect the A94 skid control ECU (brake actuator assembly) connector.


b.

Turn the ignition switch to ON.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A94)Location & Routing

Click Connector(A94)Engine Compartment>Engine Room Main Wire>Brake Actuator Assembly

A94-45 (IGR) - Body ground Ignition switch ON 11 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR