1.CHECK NO. 2 CHARCOAL CANISTER SUB-ASSEMBLY
Visually check the No. 2 canister assembly.
Visually check the No. 2 canister assembly for cracks or damage.
If cracks or damage are found, replace the No. 2 charcoal canister assembly.
Inspect the ventilation of the No. 2 canister assembly.
| *a | Port (A) |
| *b | Port (B) |
| *c | Air |
Apply compressed air to the port (A) and check that the air flows out from the port (B).
The air flows from the port (B).
If the result is not as specified, replace the No. 2 charcoal canister assembly.
Check for air leaks of the No. 2 canister assembly.
| *a | Port (A) |
| *b | Port (B) |
Connect a pressure gauge to the No. 2 charcoal canister assembly.
Close the port (B), apply 20 kPa (150 mmHg, 5.91 in. Hg) of pressurized air into the port (A), then confirm that pressure is maintained for 1 minute.
If the result is not as specified, replace the No. 2 charcoal canister assembly.