ROCKER PANEL (for Hatchback 3 Door) > CUT AND JOIN REPLACEMENT SECTIONS | |
- With the quarter panel removed.
-
Weld work for 980 MPa ultra high strength steel
Follow the welding conditions below when welding ultra high strength steel to assure sufficient weld strength. (When repairing this model)
- *1: When welding 2 panels together including 980 MPa ultra high strength steel.
Spot weld
| Pressure
| 2940 N (300 kgf, 661 lbf)
|
Weld current
| 10000 A
|
Weld time
| 14 Cyc. (0.23 Sec.)
|
Plug weld
| Plug diameter
| 10 mm (0.39 in.)
|
Wire type
| AWS A5.18 ER70S-3
|
Shield gas
| Metal active gas
|
- *2: When welding more than 3 panels together including 980 MPa ultra high strength steel. (When plug welding a third panel to 2 panels which are welded under the conditions described above.)
Plug weld
| Plug diameter
| Same as the standard method (See the introduction)
|
Wire type
| AWS A5.18 ER70S-3
|
Shield gas
| Metal active gas
|
- NOTICE:
- Be sure to use Metal active gas (Ar 80% + CO2 20%) as the shield gas when plug welding. Sufficient weld strength cannot be assured when using 100% CO2 shield gas.
Symbol meaning
|

| Remove Weld Points
|

| Remove Weld Points
|

| Cut with Disc Sander etc.
|

| Cut and Join Location
|

| Cut Location for Supply Parts
|
REMOVAL POINT
- Do not butt weld or heat repair because the heat decreases the strength of areas where ultra high strength steel is used. (See the introduction)
- Reuse *3, as the area of the outer panel that is cut and joined is in front of the supplied part cut position.
Symbol meaning
|

| Remove Weld Points
|

| Spot Weld
|

| Plug Weld
|

| Plug Weld
|

| Cut and Join Location
|

| Fillet Weld
|

| Butt Weld
|
INSTALLATION POINT
- Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.
- Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)
- If the entire supply part is not needed, remove the part of the supply part that is needed.
- Carefully cut the rocker reinforce outer so not to damage *3.
- Follow the welding conditions when welding *1 and *2 to assure sufficient weld strength. (See the introduction)
- Before temporarily installing the new parts, weld the rocker reinforce outer, center body pillar reinforcement and No.1 inner pillar with the standard number of welding points.
- After welding the rocker reinforce outer, center body pillar reinforcement and No.1 inner pillar to the vehicle side, install the rocker panel outer and *4.
- After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.