Home › Drivetrain ยท C50 MANUAL TRANSMISSION / TRANSAXLE › SHIFT LEVER ASSEMBLY (for Sedan)

SHIFT LEVER ASSEMBLY (for Sedan) > INSTALLATION



1. INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY


    C106358
  1. Install the shift lever with the 4 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 8.9 ft.*lbf }



2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY


    C106359E01
  1. Install the control shift cable onto the shift lever retainer.

  1. Install the control select cable onto the shift lever retainer.

    NOTICE:
    1. Install the cable with the protruding portion of the cable outer facing upward.
    2. After installing, check that the lock of the cable outer is protruding beyond portion A, as shown in the illustration.

  1. Connect the control shift cable to the shift lever.



    C106360E01
  1. Install the control select cable onto the shift lever retainer.

    NOTICE:
    1. Install the cable with the protruding portion of the cable outer facing upward.
    2. After installing, check that the lock of the cable outer is protruding beyond portion A, as shown in the illustration.



    C106361E01
  1. Connect the control select cable to the shift lever.

    NOTICE:
    1. Connect the control select cable so that the adjusting mechanism lock of the control select cable is installed on the left side of the vehicle.
    2. Insert the clip in the direction shown in the illustration.



3. ADJUST TRANSMISSION CONTROL CABLE ASSEMBLY
  1. Remove the console box assembly .



    C106361E01
  1. Remove the clip and disconnect the control select cable from the shift lever assembly.



    C108468E02
  1. Adjust the length of the control select cable.

    1. Slide the adjuster case cover in the direction shown in the illustration (Illustration A).

    2. Gently pull the cable rod toward the rear of the vehicle by hand to pull the cable taut.

    3. Press the lock piece into the adjuster case and lock it (Illustration B).

    4. Slide the cover in the direction shown in the illustration (Illustration C).

      NOTICE:
      Slide the cover past the protrusion portion of the lock piece (Illustration D).

  1. Install the clip to the shift lever assembly.

  1. Install the console box assembly .



4. INSTALL REAR CONSOLE BOX ASSEMBLY


    B132349
  1. Engage the 4 claws and install the rear console box.

  1. Install the 2 bolts and 2 screws.

  1. Connect the clamp.



5. INSTALL CONSOLE BOX CARPET


    B132346
  1. Install the console box carpet.



6. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY


    B132348
  1. Connect the connector.

  1. Engage the 3 clips and 3 claws and install the console upper rear panel.



7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY


    B132347
  1. Engage the 5 clips and the claw and install the upper console panel.



8. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    B132388
  1. Install the shift lever knob.



9. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER CENTER


B132316
  1. Engage the 2 claws and 2 clips and install the instrument panel finish panel lower center.