ENGINE UNIT (for Hatchback) > REASSEMBLY |
| 1. INSTALL STUD BOLT |
Using "TORX" socket wrench E5, install the 4 stud bolts.

| 2. INSTALL OIL PAN SUB-ASSEMBLY |
Remove any old packing material from the contact surface.
![]() |
Apply a continuous bead of seal packing (Diameter 2.0 to 3.0 mm (0.079 to 0.118 in.)) to the oil pan mating surface as shown in the illustration.
| *a | Seal Packing |
Install 2 new O-rings onto the cylinder block.
![]() |
Using several steps, install and tighten the 13 bolts uniformly in the sequence shown in the illustration.
| 3. INSTALL OIL STRAINER SUB-ASSEMBLY |
![]() |
Install a new gasket and the oil strainer with the 2 nuts and the bolt.
| 4. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY |
Remove any old packing material from the contact surface.
![]() |
Apply a continuous bead of seal packing (Diameter 2.5 to 3.5 mm (0.0984 to 0.1378 in.)) to the oil pan mating surface as shown in the illustration.
| *a | Seal Packing |
Install the No. 2 oil pan with the 9 bolts and the 2 nuts.
Install the drain plug with a new gasket.
| 5. INSTALL OIL FILTER UNION |
![]() |
Using a 12 mm hexagon wrench, install the oil filter union.
| 6. INSTALL OIL FILTER SUB-ASSEMBLY |
Check and clean the oil filter installation surface.
Apply clean engine oil to the gasket of a new oil filter.
Gently screw the oil filter into place, and tighten it until the gasket comes into contact with the seat.
![]() |
Using SST, tighten it an additional 3/4 turn.
| 7. INSTALL CYLINDER HEAD GASKET |
![]() |
Place a new cylinder head gasket on the cylinder block with the Lot No. stamp facing upward.
| *a | Lot No. |
| 8. INSTALL CYLINDER HEAD SUB-ASSEMBLY |
Apply a light coat of engine oil to the threads of the cylinder head bolts.
![]() |
Using several steps, install and tighten the 10 cylinder head bolts and plate washers uniformly with an 8 mm bi-hexagon wrench, in the sequence shown in the illustration.
Mark the front of the cylinder head bolt with paint.
![]() |
Retighten the cylinder head bolts 90° and then an additional by 90° as shown in the illustration.
| *a | Paint Mark |
Check that the paint mark is now at a 180° angle from the front.
![]() |
Apply a continuous bead of seal packing (Diameter 4.5 to 5.5 mm (0.177 to 0.217 in.)) as shown in the illustration.
| *1 | Cylinder Head |
| *2 | Cylinder Head Gasket |
| *3 | Cylinder Block |
| *a | Seal Packing |
| *b | Diameter: 4.5 to 5.5 mm |
| 9. INSTALL REAR ENGINE OIL SEAL |
Apply MP grease to the lip of a new rear engine oil seal.
![]() |
Using SST and a hammer, tap in the rear engine oil seal until its surface is flush with the cylinder block and oil pan.
| 10. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY |
Clamp the camshaft in a vise, and confirm that it is locked.
![]() |
Put the camshaft timing gear assembly and camshaft together with the straight pin of the groove.
| *1 | Straight Pin |
| *a | Groove |
Turn the camshaft timing gear assembly clockwise while pushing it gently toward the camshaft. When the pin fits into the groove, push to ensure a good fit.
Check that there is no clearance between the gear flange and the camshaft.
Tighten the bolt with the camshaft timing gear fixed.
Check that the camshaft timing gear assembly can move in the retard direction (to the right) and is locked in the most retarded position.
| 11. INSTALL CAMSHAFT |
Apply a light coat of engine oil to the camshaft journals.
Place the camshaft on the cylinder head with the timing mark on the camshaft timing gear facing upward.
![]() |
Examine the front marks and numbers and tighten the bolts in the sequence shown in the illustration.
| 12. INSTALL CAMSHAFT TIMING SPROCKET |
Clamp the camshaft in a vise, and confirm that it is locked.
![]() |
Align the knock pin hole the camshaft timing sprocket with the knock pin of the camshaft, and install the camshaft timing sprocket with the bolt.
| 13. INSTALL NO. 2 CAMSHAFT |
Apply a light coat of engine oil to the camshaft journals.
Place the camshaft on the cylinder head with the timing mark on the camshaft timing gear facing upward.
![]() |
Examine the front marks and numbers on the No. 1 and No. 2 camshaft bearing caps and check that the order is as shown in the illustration. Then uniformly tighten the bolts, in several steps, in the sequence shown in the illustration.
| *1 | No. 1 Bearing Cap |
| *2 | No. 2 Bearing Cap |
| 14. INSTALL CAMSHAFT POSITION SENSOR |
![]() |
Apply engine oil to the O-ring.
Install the camshaft position sensor with the bolt.
| 15. INSTALL NO. 1 CHAIN VIBRATION DAMPER |
![]() |
Install the No. 1 chain vibration damper with the 2 bolts.
| 16. INSTALL CHAIN SUB-ASSEMBLY |
![]() |
Make sure that all the timing marks are in the positions (TDC) shown in the illustration.
| *a | TDC |
| *b | Timing Mark |
![]() |
Set the timing mark of the crankshaft in a position between 40 and 140° ATDC, as illustrated.
| *a | Timing Mark |
| *b | 40° to 140° ATDC |
![]() |
Set the camshaft timing gear and the camshaft timing sprocket in the positions (20° ATDC) shown in the illustration.
| *a | 20° ATDC |
| *b | Timing Mark |
Set the crankshaft in the position (20° ATDC) shown in the illustration.
![]() |
Align the timing marks of the camshaft with the mark plates of the timing chain and install the timing chain.
| *a | Mark Plate |
| *b | Timing Mark |
| 17. INSTALL CHAIN TENSIONER SLIPPER |
![]() |
Install the chain tensioner slipper.
| 18. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY |
![]() |
Install the No. 1 chain tensioner assembly with the 2 bolts.
Remove the bar from the No. 1 chain tensioner assembly.
| 19. INSTALL OIL PUMP SEAL |
![]() |
Using SST and a hammer, tap in a new oil pump seal until its surface is flush with the timing chain cover.
Apply a light coat of MP grease to the oil pump seal lip.
| 20. INSTALL OIL PUMP ASSEMBLY |
Install 2 new O-rings to the cylinder block sub-assembly and the oil pan sub-assembly.
Apply seal packing to the oil pump assembly, cylinder head sub-assembly and the cylinder block sub-assembly as shown in the illustration.

| *a | Apply Seal Packing to the Inner Corners | *b | Seal Width (Other Part) |
| *c | Seal Width (Water Pump Part) | *d | Seal Packing Application Width 10 mm or more |
| *e | Apply enough seal packing so that it will protrude beyond the timing chain cover installation surface | - | - |
![]() |
Align the keyway of the oil pump rotor with the rectangular portion of the crankshaft, and slide the oil pump into place.
Temporarily install the oil pump assembly with the 16 bolts and the nut.

Tighten the 16 bolts and nut in the sequence shown in the illustration.
| 21. INSTALL ENGINE WATER PUMP ASSEMBLY |
Install the water pump assembly through a new water pump gasket with the 3 bolts and 2 nuts.
| 22. INSTALL TRANSVERSE ENGINE ENGINE MOUNTING BRACKET |
Install the transverse engine engine mounting bracket with the 4 bolts.
| 23. INSTALL CRANKSHAFT DAMPER SUB-ASSEMBLY |
Align the pin hole in the crankshaft damper with the pin position and install the crankshaft damper.
Temporarily install the bolt.
![]() |
Using SST, tighten the bolt while holding the crankshaft damper.
| 24. INSTALL WATER PUMP PULLEY |
Provisionally install the water pump pulley with the 3 bolts.
Using SST, hold the water pump pulley.
Tighten the 3 bolts to the specified torque.
| 25. INSPECT VALVE CLEARANCE |
Set the No. 1 cylinder to TDC/compression.
![]() |
Turn the crankshaft damper and align its timing notch with the timing mark "0" of the oil pump.
| *a | Timing Notch |
![]() |
Check that both timing marks on the camshaft timing sprocket and camshaft timing gear are facing upward, as shown in the illustration.
| *a | Timing Marks |
![]() |
Check the valves indicated in the illustration.
Using a feeler gauge, measure the clearance between the valve lifter and camshaft.
Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement adjusting shim.
Turn the crankshaft 1 complete revolution (360°) and align its timing notch with the timing mark "0" of the oil pump.
![]() |
Check the valves indicated in the illustration.
Using a feeler gauge, measure the clearance between the valve lifter and camshaft.
Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement adjusting shim.
| 26. ADJUST VALVE CLEARANCE |
![]() |
| *a | Matchmark |
Remove the fan and generator V belt .
Remove the engine mounting insulator sub-assembly RH .
Set the No. 1 cylinder to TDC/compression.
![]() |
Turn the crankshaft damper and align its timing notch with the timing mark "0" of the oil pump.
| *a | Timing Notch |
![]() |
Check that both timing marks on the camshaft timing sprocket and camshaft timing gear are facing upward, as shown in the illustration.
| *a | Timing Marks |
![]() |
Place paint marks on the chain in the places where the timing marks of the camshaft timing sprocket and the camshaft timing gear are located.
| *a | Paint Marks |
| *b | Timing Marks |
![]() |
Using an 8 mm hexagon wrench, remove the screw plug.
![]() |
Insert a screwdriver into the service hole in the chain tensioner to pull the stopper plate of the chain tensioner upward.
| *a | Stopper Plate |
![]() |
Using a wrench, rotate camshaft No. 2 clockwise to push in the plunger of the chain tensioner.
| *a | Plunger |
![]() |
Remove the screwdriver from the service hole, then align the hole in the stopper plate with the service hole and insert a 3 mm (0.12 in.) diameter bar into the holes to hold the stopper plate.
![]() |
Using a wrench, hold the hexagonal lobe of camshaft No. 2 and remove the flange bolt.
![]() |
Using several steps, loosen and remove the 11 bearing cap bolts uniformly in the sequence shown in the illustration, then remove camshaft bearing cap No. 1 and camshaft bearing cap No. 2.
![]() |
Remove the flange bolt and the camshaft timing sprocket.
![]() |
Remove No. 2 camshaft.
![]() |
Using several steps, loosen and remove the 8 bearing cap bolts uniformly in the sequence shown in the illustration, then remove No. 2 camshaft bearing cap.
![]() |
Hold the chain by hand and remove the camshaft and the camshaft timing gear assembly.
![]() |
Tie the chain with a piece of string as shown in the illustration.
Remove the 16 valve lifters.
![]() |
Using a micrometer, measure the thickness of the removed lifter.
Calculate the thickness of a new lifter so that the valve clearance comes to within the specified values.
| A | Thickness of new lifter |
| B | Thickness of used lifter |
| C | Measured valve clearance |
Select a new lifter with a thickness as close to the calculated values as possible.

| Shim No. | Thickness | Shim No. | Thickness | Shim No. | Thickness |
| 06 | 5.060 (0.1992) | 30 | 5.300 (0.2087) | 54 | 5.540 (0.2181) |
| 08 | 5.080 (0.2000) | 32 | 5.320 (0.2094) | 56 | 5.560 (0.2189) |
| 10 | 5.100 (0.2008) | 34 | 5.340 (0.2102) | 58 | 5.580 (0.2197) |
| 12 | 5.120 (0.2016) | 36 | 5.360 (0.2110) | 60 | 5.600 (0.2205) |
| 14 | 5.140 (0.2024) | 38 | 5.380 (0.2118) | 62 | 5.620 (0.2213) |
| 16 | 5.160 (0.2031) | 40 | 5.400 (0.2126) | 64 | 5.640 (0.2220) |
| 18 | 5.180 (0.2039) | 42 | 5.420 (0.2134) | 66 | 5.660 (0.2228) |
| 20 | 5.200 (0.2047) | 44 | 5.440 (0.2142) | 68 | 5.680 (0.2236) |
| 22 | 5.220 (0.2055) | 46 | 5.460 (0.2150) | 70 | 5.700(0.2244) |
| 24 | 5.240 (0.2063) | 48 | 5.480 (0.2157) | 72 | 5.720 (0.2252) |
| 26 | 5.260 (0.2071) | 50 | 5.500 (0.2165) | 74 | 5.740 (0.2260) |
| 28 | 5.280 (0.2079) | 52 | 5.520 (0.2173) |

| Shim No. | Thickness | Shim No. | Thickness | Shim No. | Thickness |
| 06 | 5.060 (0.1992) | 30 | 5.300 (0.2087) | 54 | 5.540 (0.2181) |
| 08 | 5.080 (0.2000) | 32 | 5.320 (0.2094) | 56 | 5.560 (0.2189) |
| 10 | 5.100 (0.2008) | 34 | 5.340 (0.2102) | 58 | 5.580 (0.2197) |
| 12 | 5.120 (0.2016) | 36 | 5.360 (0.2110) | 60 | 5.600 (0.2205) |
| 14 | 5.140 (0.2024) | 38 | 5.380 (0.2118) | 62 | 5.620 (0.2213) |
| 16 | 5.160 (0.2031) | 40 | 5.400 (0.2126) | 64 | 5.640 (0.2220) |
| 18 | 5.180 (0.2039) | 42 | 5.420 (0.2134) | 66 | 5.660 (0.2228) |
| 20 | 5.200 (0.2047) | 44 | 5.440 (0.2142) | 68 | 5.680 (0.2236) |
| 22 | 5.220 (0.2055) | 46 | 5.460 (0.2150) | 70 | 5.700 (0.2244) |
| 24 | 5.240 (0.2063) | 48 | 5.480 (0.2157) | 72 | 5.720 (0.2252) |
| 26 | 5.260 (0.2071) | 50 | 5.500 (0.2165) | 74 | 5.740 (0.2260) |
| 28 | 5.280 (0.2079) | 52 | 5.520 (0.2173) |
Install the selected valve lifter.
Apply a light coat of engine oil to the camshaft and camshaft journals.
![]() |
Install the chain onto the camshaft timing gear with the paint mark and the timing mark aligned as shown in the illustration.
| *a | Paint Mark |
| *b | Timing Mark |
![]() |
Examine the front marks and the numbers on No. 2 camshaft bearing cap and check that the sequence is as shown in the illustration. Then uniformly tighten the bolts in several steps in the sequence shown in the illustration.
![]() |
Install No. 2 camshaft.
![]() |
Hold the chain, and align the timing mark on the camshaft timing sprocket with the paint mark of the chain.
| *a | Paint Mark |
| *b | Timing Mark |
| *c | Pin |
Align the alignment pin hole in the camshaft timing sprocket with the alignment pin of the camshaft, and install the sprocket onto the camshaft.
![]() |
Provisionally install the flange bolt.
![]() |
Examine the front marks and the numbers of camshaft No. 1 bearing cap and No. 2 camshaft bearing cap and check that the sequence is as shown in the illustration. Then uniformly tighten the bolts in several steps, in the sequence shown in the illustration.
| *a | No. 1 Bearing Cap |
| *b | No. 2 Bearing Cap |
![]() |
Using a union nut wrench 14 mm, hold the hexagonal lobe of camshaft No. 2 and install the flange bolt.
Remove the bar from the timing chain tensioner.
![]() |
Turn the crankshaft damper and align its timing notch with the timing mark "0" of the oil pump.
| *a | Timing Notch |
![]() |
Check that all the pairs of timing marks are aligned.
| *a | Paint Marks |
| *b | Timing Marks |
Apply adhesive to the 2 or 3 threads of the screw plug.
![]() |
Using an 8 mm hexagon wrench, install the screw plug.
Install the engine mounting insulator sub-assembly RH . (for Hatchback)
Install the fan and generator V belt .
Adjust the fan and generator V belt .
Inspect the fan and generator V belt .
| 27. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY |
![]() |
Apply a light coat of engine oil to a new O-ring, and install it onto the camshaft timing oil control valve.
Install the camshaft timing oil control valve with the bolt.
| 28. INSTALL FUEL INJECTOR ASSEMBLY |
![]() |
| *1 | O-ring |
Apply a light coat of gasoline or spindle oil to new O-rings, then install one onto each fuel injector.
Apply a light coat of gasoline or spindle oil to the contact surfaces of the fuel delivery pipe and the O-ring of the fuel injector.
![]() |
While turning the fuel injector left and right, install it onto the fuel delivery pipe.
![]() | Push |
![]() | Turn |
| 29. INSTALL INJECTOR VIBRATION INSULATOR |
Install the 4 new injector vibration insulators onto the cylinder head.
| 30. INSTALL NO. 1 DELIVERY PIPE SPACER |
Install the 2 No. 1 delivery pipe spacers onto the cylinder head.
| 31. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY |
![]() |
Install the fuel delivery pipe sub-assembly with the 4 fuel injectors, then provisionally install the 3 bolts.
Tighten the 3 bolts to the specified torque.
| 32. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
Install a new gasket onto the cylinder head cover.
![]() |
Apply seal packing to the cylinder head, as shown in the illustration.
![]() | Seal Packing |
![]() |
Temporarily install the cylinder head cover sub-assembly with the 9 bolts, 2 nuts and 2 seal washers.
Tighten the 9 bolts and 2 nuts in the sequence shown in the illustration.
| 33. INSTALL VENTILATION VALVE SUB-ASSEMBLY |
![]() |
Install the ventilation valve onto the cylinder head cover.
| 34. INSTALL OIL LEVEL DIPSTICK GUIDE |
Apply engine oil to a new O-ring.
Install the O-ring onto the oil level dipstick guide.
Install the oil level dipstick guide with the bolt.
| 35. INSTALL CRANKSHAFT POSITION SENSOR |
Apply a light coat of engine oil to the O-ring.
Install the crankshaft position sensor with the bolt.
| 36. INSTALL OIL FILLER CAP GASKET |
Install the oil filler cap gasket onto the oil filler cap.
| 37. INSTALL OIL FILLER CAP SUB-ASSEMBLY |
Install the oil filler cap onto the cylinder head cover.
| 38. INSTALL THERMOSTAT |
Install a new gasket onto the thermostat.
![]() |
Install the thermostat with the jiggle valve facing upward.
| *1 | Jiggle Valve |
| 39. INSTALL WATER INLET |
![]() |
Install the water inlet with the 2 nuts.
| 40. INSTALL ENGINE COOLANT TEMPERATURE SENSOR |
Install a new gasket onto the engine coolant temperature sensor.
![]() |
Using a 19 mm socket wrench, install the engine coolant temperature sensor.
| 41. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY |
![]() |
Apply adhesive to the end 2 or 3 threads of the engine oil pressure switch.
| *1 | Adhesive |
![]() |
Using a 24 mm deep socket wrench, install the engine oil pressure switch.
| 42. INSTALL KNOCK SENSOR |
![]() |
Install the knock sensor with the nut as shown in the illustration.
| 43. INSTALL SPARK PLUG |
![]() |
Using a 16 mm spark plug wrench, install the 4 spark plugs.