AIR CONDITIONING SYSTEM (for Hatchback) > PTC Heater Circuit |

| 1.PERFORM ACTIVE TEST USING TECHSTREAM |
Connect the Techstream to the DLC3.
Turn the ignition switch to ON.
Turn the Techstream on.
Enter the following menus: Body Electrical / Air Conditioner / Active Test.
According to the display on the Techstream, perform the Active Test.
| Tester Display | Test Part | Control Range | Diagnostic Note |
| Heater Active Level | Heater level | Min.: 0, Max.: 3 | - |
![]() |
Measure the voltage according to the value(s) in the table below while performing the Active Test.
| Tester Connection | Condition | Specified Condition |
| 0 (DAG0) - Body ground | Heater Active Level 1 to 3 | 3.5 to 5 V |
| 1 (DAG1) - Body ground | Heater Active Level 1 to 3 | 3.5 to 5 V |
| *a | Upper View of No. 2 Integration Relay |
|
| ||||
| OK | |
| 2.INSPECT QUICK HEATER ASSEMBLY |
Inspect the quick heater assembly (Click here).
|
| ||||
| OK | |
| 3.PERFORM ACTIVE TEST USING TECHSTREAM |
Disconnect the A69 quick heater assembly connector.
Connect the Techstream to the DLC3.
Start the engine.
Turn the Techstream on.
Enter the following menus: Body Electrical / Air Conditioner / Active Test.
According to the display on the Techstream, perform the Active Test.
| Tester Display | Test Part | Control Range | Diagnostic Note |
| Heater Active Level | Heater level | Min.: 0, Max.: 3 | - |
![]() |
Measure the voltage according to the value(s) in the table below while performing the Active Test.
| Tester Connection | Condition | Specified Condition |
| A69-1 (B) - Body ground | Heater Active Level 0 | Below 1 V |
| Heater Active Level 1 | Below 1 V | |
| Heater Active Level 2 | Below 1 V | |
| Heater Active Level 3 | 11 to 14 V | |
| A69-2 (B) - Body ground | Heater Active Level 0 | Below 1 V |
| Heater Active Level 1 | 11 to 14 V | |
| Heater Active Level 2 | 11 to 14 V | |
| Heater Active Level 3 | 11 to 14 V | |
| A69-3 (B) - Body ground | Heater Active Level 0 | Below 1 V |
| Heater Active Level 1 | Below 1 V | |
| Heater Active Level 2 | 11 to 14 V | |
| Heater Active Level 3 | 11 to 14 V |
| *a | Front view of wire harness connector (to Quick Heater Assembly) |
|
| ||||
| OK | ||
| ||
| 4.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - BATTERY AND IG1 NO. 1 RELAY) |
![]() |
Remove the No. 2 integration relay from the No. 2 engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| 2-1 (ALT) - Body ground | Always | 11 to 14 V |
| 2C-2 (IG1) - Body ground | Ignition switch ON | 11 to 14 V |
| *1 | No. 2 Engine Room Relay Block |
| *a | Front view of wire harness connector (to No. 2 Integration Relay) |
|
| ||||
| OK | |
| 5.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - BODY GROUND) |
![]() |
Remove the No. 2 integration relay from the No. 2 engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 2B-1 (GND1) - Body ground | Always | Below 1 Ω |
| 2C-16 (GND2) - Body ground | Always | Below 1 Ω |
| *a | Front view of wire harness connector (to No. 2 Integration Relay) |
|
| ||||
| OK | |
| 6.PERFORM ACTIVE TEST USING TECHSTREAM |
Remove the No. 2 integration relay from the No. 2 engine room relay block.
Connect the Techstream to the DLC3.
Start the engine.
Turn the Techstream on.
Enter the following menus: Body Electrical / Air Conditioner / Active Test.
According to the display on the Techstream, perform the Active Test.
| Tester Display | Test Part | Control Range | Diagnostic Note |
| Heater Active Level | Heater level | Min.: 0, Max.: 3 | - |
![]() |
Measure the voltage according to the value(s) in the table below while performing the Active Test.
| Tester Connection | Condition | Specified Condition |
| 2C-12 (PTCA) - Body ground | Heater Active Level 0 | Below 1 V |
| Heater Active Level 1 | 11 to 14 V | |
| Heater Active Level 2 | 11 to 14 V | |
| Heater Active Level 3 | 11 to 14 V | |
| 2C-13 (PTCB) - Body ground | Heater Active Level 0 | Below 1 V |
| Heater Active Level 1 | Below 1 V | |
| Heater Active Level 2 | 11 to 14 V | |
| Heater Active Level 3 | 11 to 14 V | |
| 2C-14 (PTCC) - Body ground | Heater Active Level 0 | Below 1 V |
| Heater Active Level 1 | Below 1 V | |
| Heater Active Level 2 | Below 1 V | |
| Heater Active Level 3 | 11 to 14 V |
| *a | Front view of wire harness connector (to No. 2 Integration Relay) |
|
| ||||
| OK | ||
| ||
| 7.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - AIR CONDITIONING AMPLIFIER ASSEMBLY) |
Remove the No. 2 integration relay from the No. 2 engine room relay block.
Disconnect the D130 air conditioning amplifier assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 2C-12 (PTCA) - D130-13 (PTC1) | Always | Below 1 Ω |
| 2C-13 (PTCB) - D130-19 (PTC2) | Always | Below 1 Ω |
| 2C-14 (PTCC) - D130-20 (PTC3) | Always | Below 1 Ω |
| 2C-12 (PTCA) - Body ground | Always | 10 kΩ or higher |
| 2C-13 (PTCB) - Body ground | Always | 10 kΩ or higher |
| 2C-14 (PTCC) - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | ||
| ||