AIR CONDITIONING PANEL (for Hatchback) > INSTALLATION |
| 1. CONNECT AIR MIX DAMPER CONTROL CABLE SUB-ASSEMBLY |
Engage the 2 claws and connect the air mix damper control cable.
| 2. CONNECT DEFROSTER DAMPER CONTROL CABLE SUB-ASSEMBLY |
Engage the 2 claws and connect the defroster damper control cable.
| 3. INSTALL AIR CONDITIONING PANEL ASSEMBLY |
Connect the connector.
Engage the claw and 7 clips and install the air conditioning panel.
| 4. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL |
Engage the 5 clips and install the instrument cluster finish panel.
| 5. INSTALL INSTRUMENT CLUSTER FINISH CENTER PANEL SUB-ASSEMBLY |
Connect the connector.
Engage the 7 clips and install the instrument cluster finish center panel.
| 6. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY |
![]() |
Engage the 4 guides and 10 clips and install the instrument cluster finish panel garnish.