Use the same procedure for the RH and LH sides.
The procedure described below is for the LH side.
75554E
1.INSTALL QUARTER GARNISH MOULDING
When installing the quarter garnish moulding, heat the quarter pillar cover sub-assembly using a heat light.
| *a | Heated Part |
| *b | Heat Light |
Do not touch the heat light and heated parts, touching the heat light may result in burns.
Touching heated parts for a long time may result in burns.
| Item | Temperature |
|---|---|
| Quarter Pillar Cover Sub-assembly | 20 to 30°C (68 to 86°F) |
Do not heat the quarter pillar cover sub-assembly excessively.
Clean the quarter garnish moulding installation surface with a non-residue solvent.
Apply primer to the quarter garnish moulding installation area on the quarter pillar cover sub-assembly.
Apply primer evenly so that there are no uncoated areas.
Remove the peeling paper on a new quarter garnish moulding while making sure not to touch the adhesive surface.
Install the quarter garnish moulding as shown in the illustration.
Press the double-sided tape on the quarter garnish moulding firmly to ensure proper adhesion.
After the primer dries (3 minutes or more), install the quarter garnish moulding.
After applying primer, reapply primer after 24 hours elapse.
62506C
2.INSTALL QUARTER PILLAR COVER SUB-ASSEMBLY
Install the 6 new clips.
When reusing the quarter pillar cover sub-assembly, replace the 6 clips with new ones.
Engage the 6 clips and install the quarter pillar cover sub-assembly.
Remove the protective tape.