Home › Brake › BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS › ELECTRONICALLY CONTROLLED BRAKE SYSTEM (for HV Model) › 2020.03–2020.07
RM36W0E _54 Brake _088016 BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS _0425342 ELECTRONICALLY CONTROLLED BRAKE SYSTEM(for HV Model) J

BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS  ELECTRONICALLY CONTROLLED BRAKE SYSTEM(for HV Model)  ABS Warning Light Remains ON  


DESCRIPTION

The skid control ECU (brake booster with master cylinder assembly) is connected to the combination meter assembly via CAN communication.

If any of the following is detected, the ABS warning light remains on:

·

The skid control ECU (brake booster with master cylinder assembly) connector is disconnected from the brake booster with master cylinder assembly.

·

There is a malfunction in the skid control ECU (brake booster with master cylinder assembly) internal circuit.

·

There is an open in the wire harness between the combination meter assembly and the skid control ECU (brake booster with master cylinder assembly).

·

The ABS control system is defective.


HINT:

In some cases, the GTS cannot be used when the skid control ECU (brake booster with master cylinder assembly) is malfunctioning.


WIRING DIAGRAM

C397487E15
0.896,0.927 1.51,1.125 0.615,0.198 10 false CANL 0.885,1.479 1.5,1.677 0.615,0.198 10 false CANH 1.396,0.729 1.708,0.927 0.313,0.198 10 false 25 1.396,1.302 1.708,1.5 0.313,0.198 10 false 9 2.5,2.167 3.927,2.417 1.427,0.25 10 false from IGR-NO. 1 Relay 2.083,3.167 5.75,3.365 3.667,0.198 10 false : CAN Communication Line 0.115,3.896 0.74,4.094 0.625,0.198 10 false H6 0.115,4.063 4.094,4.26 3.979,0.198 10 false Combination Meter Assembly 4.479,2.323 6.469,2.521 1.99,0.198 10 false ECU-IGR NO. 3 5.688,0.729 6,0.927 0.313,0.198 10 false 42 5.688,1.292 6,1.49 0.313,0.198 10 false 43 5.948,0.896 6.563,1.094 0.615,0.198 10 false CA1L 5.948,1.469 6.563,1.667 0.615,0.198 10 false CA1H 5.948,2.167 6.406,2.365 0.458,0.198 10 false IGR 5.688,2.042 6,2.24 0.313,0.198 10 false 23 5.688,2.76 6,2.958 0.313,0.198 10 false 26 5.677,3.177 5.99,3.375 0.313,0.198 10 false 39 5.948,2.875 6.563,3.073 0.615,0.198 10 false GND1 5.948,3.281 6.563,3.479 0.615,0.198 10 false GND2 5.031,3.896 6.281,4.094 1.25,0.198 10 false A38 5.031,4.052 7.104,4.542 2.073,0.49 10 false Skid Control ECU (Brake Booster with Master Cylinder Assembly)

CAUTION / NOTICE / HINT

NOTICE:
·

After replacing the skid control ECU (brake booster with master cylinder assembly), perform linear solenoid valve offset learning, ABS holding solenoid valve learning, yaw rate and acceleration sensor zero point calibration and system information memorization after performing "Reset Memory".

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM (for HV Model)>UTILITY

·

Inspect the fuses for circuits related to this system before performing the following procedure.

·

Before performing this procedure, depress the brake pedal and confirm that the stop lights illuminate.



PROCEDURE

1.CHECK CAN COMMUNICATION SYSTEM

Result:
Result Proceed to
DTCs are not output A
DTCs are output B



A

2.CHECK IF BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY CONNECTOR IS SECURELY CONNECTED

B

2.CHECK IF BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY CONNECTOR IS SECURELY CONNECTED
a.

Check if the skid control ECU (brake booster with master cylinder assembly) connector is securely connected.

OK:

The connector is securely connected.



Result:
Proceed to
OK
NG



OK

3.CHECK AUXILIARY BATTERY

NG

CONNECT CONNECTOR TO BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY CORRECTLY

3.CHECK AUXILIARY BATTERY
a.

Check the auxiliary battery voltage.

Standard Voltage:
Tester Connection Switch Condition Specified Condition
Auxiliary battery Ignition switch ON 11 to 14 V
Auxiliary battery Ignition switch ON (READY) 11 to 15.5 V



Result:
Proceed to
OK
NG



OK

4.CHECK HARNESS AND CONNECTOR (IGR TERMINAL)

NG

CHARGE OR REPLACE AUXILIARY BATTERY

4.CHECK HARNESS AND CONNECTOR (IGR TERMINAL)
a.

Turn the ignition switch off.


b.

Make sure that there is no looseness at the locking part and the connecting part of the connector.

OK:

The connector is securely connected.



c.

Disconnect the A38 skid control ECU (brake booster with master cylinder assembly) connector.


d.

Check both the connector case and the terminals for deformation and corrosion.

OK:

No deformation or corrosion.



e.

Turn the ignition switch to ON.


f.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition
A38-23 (IGR) - Body ground Ignition switch ON 11 to 14 V



Result:
Proceed to
OK
NG



OK

5.CHECK HARNESS AND CONNECTOR (GND TERMINAL)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (IGR CIRCUIT)

5.CHECK HARNESS AND CONNECTOR (GND TERMINAL)
a.

Turn the ignition switch off.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
A38-26 (GND1) - Body ground Always Below 1 Ω
A38-39 (GND2) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

6.INSPECT COMBINATION METER ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (GND CIRCUIT)

6.INSPECT COMBINATION METER ASSEMBLY
a.

Perform the Active Test of the combination meter assembly using the GTS.

Body Electrical > Combination Meter > Active Test
Tester Display
ABS Warning
50004 409 109

b.

Check the combination meter assembly.

OK:

The ABS warning light turns on or off in accordance with GTS operation.



Result:
Proceed to
OK
NG



OK

REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY

NG