Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
75561
1.INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP (w/o Glass Roof)
When installing new No. 1 roof drip side finish moulding clips, remove any double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with a non-residue solvent.
| *a | Adhesive |
| *b | 2 to 3 mm Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to each new No. 1 roof drip side finish moulding clip.
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the No. 1 roof drip side finish moulding clips.
| *a | View A | *b | View B |
| Area | Measurement | Area | Measurement |
|---|---|---|---|
| A | 1.5 to 2.5 mm (0.0591 to 0.0984 in.) | B | 4.0 mm (0.157 in.) |
| C | 1.9 to 2.9 mm (0.0748 to 0.114 in.) | D | 4.0 mm (0.157 in.) |
Install the roof drip side finish moulding when 40 minutes or more have elapsed since the No. 1 roof drip side finish moulding clips were installed.
Initial hardening time: 40 minutes
Complete hardening time: 24 hours
75561
2.INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP (w/ Glass Roof)
When installing new No. 1 roof drip side finish moulding clips, remove any double-sided tape remaining where the No. 1 roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with a non-residue solvent.
| *a | Adhesive |
| *b | 2 to 3 mm Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to each new No. 1 roof drip side finish moulding clip.
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
Install the No. 1 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the No. 1 roof drip side finish moulding clips.
| *a | View A | *b | View B |
| Area | Measurement | Area | Measurement |
|---|---|---|---|
| A | 1.9 to 2.9 mm (0.0748 to 0.114 in.) | B | 37.8 mm (1.488 in.) |
| C | 1.9 to 2.9 mm (0.0748 to 0.114 in.) | D | 4.0 mm (0.157 in.) |
Install the roof drip side finish moulding when 40 minutes or more have elapsed since the No. 1 roof drip side finish moulding clips were installed.
Initial hardening time: 40 minutes
Complete hardening time: 24 hours
75552
3.INSTALL ROOF DRIP SIDE FINISH MOULDING (w/o Glass Roof)
Engage the clips to install the roof drip side finish moulding.
Remove the protective tape.
75552
4.INSTALL ROOF DRIP SIDE FINISH MOULDING (w/ Glass Roof)
Engage the clips to install the roof drip side finish moulding.
Remove the protective tape.