Home › Engine / Hybrid System › M15A-FXE (EMISSION CONTROL) › CANISTER (for No. 2) › from 2020.07
RM36W0E _51 Engine / Hybrid System _088663 M15A-FXE EMISSION CONTROL _0431173 CANISTER(for No. 2) G

M15A-FXE EMISSION CONTROL  CANISTER(for No. 2)  INSPECTION  


PROCEDURE

Hide 1.CHECK NO. 2 CHARCOAL CANISTER SUB-ASSEMBLY

a.

Visually check the No. 2 canister assembly.

i.

Visually check the No. 2 canister assembly for cracks or damage.

If cracks or damage are found, replace the No. 2 charcoal canister assembly.



b.

Inspect the ventilation of the No. 2 canister assembly.

i.
A496656C02
0.5,0.26 0.719,0.26 0.719,0.26 0.948,0.51 false 3.083,1.271 2.833,1.271 2.833,1.271 2.542,1.604 false 0.323,0.198 0.635,0.396 0.313,0.198 10 false *a 3.115,1.177 3.427,1.375 0.313,0.198 10 false *b
*a Port (A)
*b Port (B)
*c Air


Apply compressed air to the port (A) and check that the air flows out from the port (B).

OK:

The air flows from the port (B).


If the result is not as specified, replace the No. 2 charcoal canister assembly.



c.

Check for air leaks of the No. 2 canister assembly.

i.
A496657C03
0.938,2 0.76,1.667 0.76,1.667 0.552,1.667 false 2.531,3.083 2.313,2.635 2.313,2.635 2.052,2.635 false 0.354,1.604 0.646,1.854 0.292,0.25 10 false *a 1.875,2.563 2.167,2.813 0.292,0.25 10 false *b
*a Port (A)
*b Port (B)


Connect a pressure gauge to the No. 2 charcoal canister assembly.


ii.

Close the port (B), apply 20 kPa (150 mmHg, 5.91 in. Hg) of pressurized air into the port (A), then confirm that pressure is maintained for 1 minute.

If the result is not as specified, replace the No. 2 charcoal canister assembly.