2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Aug 2005 – Dec 2005

Versions by build date: Aug 2005 – Dec 2005 from Jan 2006

NOTICE:
Always use "Torx" socket wrench E10 when installing the rear seat.


1. INSTALL FUEL SUCTION WITH PUMP AND GAUGE TUBE ASSEMBLY

A118738
  1. Install a new fuel suction tube gasket onto the fuel tank.

  1. A118740
    Align the protrusion of the fuel pump with the cutout of the fuel tank and install the fuel suction with pump and gauge tube assembly.

    NOTICE:
    The arm of the sender gauge should not be bent.


2. INSTALL FUEL PUMP GAUGE RETAINER

A119124E01
  1. Using SST, turn the retainer 540° clockwise from the screw starting point and align the claw of the retainer with the matchmark on the fuel tank.

    SST
    09808-14020   (09808-01410, 09808-01420, 09808-01430)

    NOTICE:
    Replace the fuel pump gauge retainer with a new one if not installed properly.
    Part No. 77144-52040

    HINT:
    1. Align the claws of the fuel pump gauge retainer and the tips of SST.
    2. At the point where the retainer is turned 90° from the start of the thread, push the retainer in from the opposite side to the start of the thread. Check that the thread of the retainer is properly engaged with that on the fuel tank.


3. CONNECT CANISTER OUTLET HOSE SUB-ASSEMBLY NO. 1

A115477
  1. Connect the canister outlet hose.


4. CONNECT FUEL EMISSION TUBE NO. 2

A115476
  1. Connect the fuel emission tube.


5. CONNECT FUEL TANK MAIN TUBE SUB-ASSEMBLY

A125126E01
  1. Insert the fuel tank main tube.

  1. Install the tube joint clip.

    NOTICE:
    1. Check that there are no scratches or foreign objects on the connecting parts.
    2. Check that the fuel tube joint is inserted securely.
    3. Check that the fuel tube joint clip is on the collar of the fuel tube joint.
    4. After installing the tube joint clip, check that the fuel tube joint have not been pulled off.
    5. Do not damage any clip. If a clip is damaged, replace it.


6. INSTALL REAR FLOOR SERVICE HOLE COVER

A119173
  1. Connect the fuel pump connector.

  1. A118729E01
    Install the rear floor service hole cover with new butyl tape.


7. INSTALL REAR SEAT ASSEMBLY

  1. B126922E01
    Insert the 2 location pins through the 2 body holes and install the rear seat.

  1. Using "Torx" socket wrench E10, install the 4 bolts in the sequence shown in the illustration.

    Torque:
    37 N*m{ 375 kgf*cm , 27 ft.*lbf }

  1. B114740E01
    Install the rear seat cushion.

  1. Using "Torx" socket wrench E10, install the 3 bolts in the sequence shown in the illustration.

    Torque:
    37 N*m{ 375 kgf*cm , 27 ft.*lbf }


8. INSTALL REAR SEAT LEG COVER NO. 2

  1. B114739
    Engage the 3 claws and install the No. 2 rear seat leg cover.


9. INSTALL REAR SEAT LEG COVER NO. 1

  1. B114738
    Engage the 4 claws and install the No. 1 rear seat leg cover.


10. INSTALL DECK FLOOR BOX (w/ Deck Board)

  1. B106445
    Install the deck floor box and lock the 2 knobs.


11. INSTALL SPARE WHEEL COVER ASSEMBLY (w/ Deck Board)

  1. B119913
    Install the spare wheel cover.


12. INSTALL DECK BOARD SUB-ASSEMBLY (w/ Deck Board)

  1. B106447
    Set the deck board and lock the 2 knobs.


13. INSTALL PACKAGE TRAY TRIM PANEL ASSEMBLY

  1. B114569E01
    Engage the 2 claws and install the package tray trim panel.

  1. Install the 5 pieces of hook tape.

  1. Install the 2 package tray trim suspenders.


14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }


15. CHECK FOR FUEL LEAKAGE
  1. When using the intelligent tester.

    1. Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch on (IG) and intelligent tester main switch on.

      NOTICE:
      Do not start the engine.

    3. Select the Active Test mode on the intelligent tester.

      HINT:
      Refer to the intelligent tester operator's manual for further details.

  1. Check that there is no fuel leakage anywhere on the fuel system after doing maintenance.

← REASSEMBLY (from Aug 2005)INSTALLATION (from Jan 2006) →