INSTALLATION
Removal / installation · Vehicles built from Nov 2005
| 1.
INSTALL BACK-UP LIGHT SWITCH ASSEMBLY |
 |
Using SST, install the back-up light switch with a new gasket onto the transaxle case.
- SST
- 09817-16011
-
Torque:
- 40 N*m{
410 kgf*cm
, 30 ft.*lbf
}
- Connect the back-up light switch connector.
Install the wire harness bracket with the bolt.
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}
Connect the wire harness clamp.
| 2.
INSTALL NO. 1 AIR TUBE |
 |
- Install the No. 1 air tube with the 2 bolts.
-
Torque:
- 20 N*m{
199 kgf*cm
, 14 ft.*lbf
}
Install the wire harness bracket with the bolt.
-
Torque:
- 3.5 N*m{
36 kgf*cm
, 31 in.*lbf
}
Connect the No. 1 air hose with the clamp.
-
Torque:
- 6.0 N*m{
61 kgf*cm
, 53 in.*lbf
}
| 3.
INSTALL NO. 2 AIR HOSE |
 |
- Install the No. 2 air hose with the 2 clamps.
-
Torque:
- 6.0 N*m{
61 kgf*cm
, 53 in.*lbf
}
| 4.
INSTALL BATTERY CARRIER |
 |
- Install the battery carrier with the 5 bolts.
-
Torque:
- 17 N*m{
175 kgf*cm
, 13 ft.*lbf
}
| 7.
INSTALL BATTERY HOLD DOWN CLAMP |
|
| 8.
INSTALL AIR CLEANER ASSEMBLY
|
 |
- Install the air cleaner case sub-assembly with air cleaner inlet with the 3 bolts.
-
Torque:
- 7.8 N*m{
80 kgf*cm
, 69 in.*lbf
}
| 9.
INSTALL NO. 1 AIR CLEANER HOSE |
 |
- Connect the No. 1 air cleaner hose with the 2 clips.
Connect the 2 fuel hoses.
Connect the No. 1 air cleaner hose with the clamp.
-
Torque:
- 6.0 N*m{
61 kgf*cm
, 53 in.*lbf
}
| 10.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
 |
-
Torque:
- 5.4 N*m{
55 kgf*cm
, 48 in.*lbf
}