2005-2008 Yaris · Service Manual TRANSMISSION

INSPECTION

Inspection · Vehicles built from Aug 2005


INSPECT SHIFT SOLENOID VALVE S1

C117936E01
  1. Measure the resistance.

    Standard resistance:
    Tester Connection
    Specified Condition
    Solenoid Connector (S1) - Solenoid Body (S1)
    11 to 15 Ω at 20°C (68°F)

  1. Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the operation of the valve.

    NOTICE:
    While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

    OK:
    The solenoid makes an operating sound.


INSPECT SHIFT SOLENOID VALVE S2

C117936E01
  1. Measure the resistance.

    Standard resistance:
    Tester Connection
    Specified Condition
    Solenoid Connector (S2) - Solenoid Body (S2)
    11 to 15 Ω at 20°C (68°F)

  1. Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the valve operation.

    NOTICE:
    While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

    OK:
    The solenoid makes an operating sound.


INSPECT SHIFT SOLENOID VALVE ST

C117937E01
  1. Measure the resistance.

    Standard resistance:
    Tester Connection
    Specified Condition
    Solenoid Connector (ST) - Solenoid Body (ST)
    11 to 15 Ω at 20°C (68°F)

  1. Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the valve operation.

    NOTICE:
    While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

    OK:
    The solenoid makes an operating sound.


INSPECT SHIFT SOLENOID VALVE SLT

D025466E13
  1. Measure the resistance.

    Standard resistance:
    Tester Connection
    Specified Condition
    1 - 2
    5.0 to 5.6 Ω at 20°C (68°F)

  1. Connect the positive (+) battery lead with a 21 W bulb to terminal 2 and the negative (-) battery lead to terminal 1 of the solenoid valve connector, and check the valve operation.

    NOTICE:
    While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

    OK:
    The solenoid makes an operating sound.


INSPECT SHIFT SOLENOID VALVE SL

C117940E01
  1. Measure the resistance.

    Standard resistance:
    Tester Connection
    Specified Condition
    Solenoid Connector (SL) - Solenoid Body (SL)
    11 to 15 Ω at 20°C (68°F)

  1. Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the valve operation.

    NOTICE:
    While using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

    OK:
    The solenoid makes an operating sound.

← DISASSEMBLY (from Aug 2005)REASSEMBLY (from Aug 2005) →