2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Aug 2005


1. INSTALL IGNITION COIL NO. 1

A115485
  1. Install the 4 ignition coils with the 4 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. A115484
    Connect the 4 ignition coil connectors.


2. INSTALL CYLINDER HEAD COVER NO. 2

A116235E01
  1. Tighten 2 A nuts, then 2 B nuts .

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

← REMOVAL (from Aug 2005)PARTS LOCATION (from Aug 2005) →