2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Nov 2005


1. INSTALL ACC CUT RELAY

A115436
  1. Remove the ACC cut relay.


2. INSTALL INSTRUMENT PANEL BOX

B108189E01
  1. Insert the stopper of the instrument panel box from the cutout of the instrument panel lower.

  1. Engage the 2 hinges with the instrument panel open.

  1. Close the instrument panel box.


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

← INSPECTION (from Nov 2005)COMPONENTS (from Nov 2005) →