INSTALLATION
Removal / installation · Vehicles built from Nov 2005
| 1.
INSTALL DIESEL THROTTLE BODY ASSEMBLY |
 |
- Install a new gasket and the diesel throttle body with the 4 bolts.
-
Torque:
- 20 N*m{
205 kgf*cm
, 15 in.*lbf
}
- Connect the throttle position sensor connector.
Connect the throttle control motor connector.
| 2.
INSTALL AIR HOSE NO.3 |
 |
- Install air hose No. 3 with the 2 hose clamps.
-
Torque:
- 6.0 N*m{
60 kgf*cm
, 53 in.*lbf
}
| 3.
INSTALL ENGINE COVER SUB-ASSEMBLY NO. 1
|
 |
Engage the 4 pins and install engine cover No. 1.
| 4.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
 |
-
Torque:
- 5.4 N*m{
55 kgf*cm
, 48 in.*lbf
}