2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Nov 2005


1. INSTALL MASS AIR FLOW METER ASSEMBLY
  1. Install the mass air flow meter with the 2 screws.

    NOTICE:
    Make sure that the O-ring is not cracked or jammed when installing.

  1. Connect the mass flow meter connector.


2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

← REMOVAL (from Nov 2005)COMPONENTS (from Nov 2005) →