2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Nov 2005


1. INSTALL OIL COOLER ASSEMBLY
  1. Check and clean the oil cooler installation surface.

  1. Apply engine oil to the O-ring of a oil cooler.

  1. G036379
    With the antirotation bracket of the oil cooler in contact with the oil pan side, temporarily install the oil cooler with a nut.

  1. G036378E01
    Using SST, tighten the nut to the specified torque.
    SST
    09229-55010  

    Torque:
    66 N*m{ 673 kgf*cm , 49 ft.*lbf }

  1. G036377
    Connect the oil cooler hose to the oil cooler.


2. INSTALL OIL FILTER SUB-ASSEMBLY

A125724E01
  1. Check and clean the oil filter installation surface.

  1. Apply clean engine oil to the gasket of a new oil filter.

  1. Lightly screw the oil filter into place, then tighten it until the gasket comes into contact with the seat.

  1. Using SST, tighten it an additional 3/4 turn.

    SST
    09228-07501  

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Close the service cover and install the screw.


3. ADD ENGINE OIL
  1. Fill the engine oil with fresh engine oil.

    Capacity:
    Item
    Capacity
    Drain and refill with oil filter change
    4.3 liters (4.5 US qts, 3.8 lmp. qts)
    Drain and refill without oil filter change
    3.8 liters (4.0 US qts, 3.3 lmp. qts)
    Dry fill
    4.8 liters (5.1 US qts, 4.2 lmp. qts)


4. ADD ENGINE COOLANT

A128306E01
  1. Remove air bleed valve A.

  1. A128305
    Fill the cooling system with coolant up to line B.

    Capacity:
    4.7 liters (5.0 US qts, 4.1 lmp. qts)

    HINT:
    1. Use of improper coolant may damage the engine cooling system.
    2. Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate engine coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

    NOTICE:
    Do not substitute plain water for engine coolant.

  1. A128306E01
    Tighten air bleed valve A.

  1. Install the radiator cap.

  1. Warm up the engine.

    1. Set the air conditioning as follows while warming up the engine.

      Item
      Manual air conditioning system
      Automatic air conditioning system
      Set control as follows
      Fan speed - Any setting except "OFF"
      Temperature - Toward WARM
      Air conditioning switch "OFF"
      Fan speed - Any setting except "OFF"
      Temperature - To the highest temperature
      Air conditioning switch "OFF"
      "AUTO" switch "OFF"

  1. Run the engine at 3,000 rpm for 5 seconds and idling for 45 seconds alternately.

  1. Do the above operation for 7 minutes or more.

  1. After the engine cools down, check that the coolant level is between LOW and FULL lines.


5. CHECK FOR ENGINE OIL LEAKAGE

6. CHECK FOR ENGINE COOLANT LEAKAGE

CAUTION:
To avoid the danger of being burned, do not remove the radiator cap sub-assembly while the engine and radiator assembly are still hot. Thermal expansion will cause hot engine coolant and steam to blow out from the radiator assembly.

  1. A128299
    Fill the radiator assembly with engine coolant, then attach a radiator cap tester.

  1. Pump it to 137 kPa (1.4 kgf/cm2, 19.9 psi), then check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator assembly and water pump assembly for leakage. If there are no signs or traces of external engine coolant leakage, check the heater core, cylinder block and head.


7. INSTALL ENGINE UNDER COVER
  1. Provisionally install the engine under cover with the 5 bolts, 4 screws and 2 clips.

  1. Tighten the 4 screws.

  1. Tighten the 5 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

← INSPECTION (from Nov 2005)ON-VEHICLE INSPECTION (from Aug 2005) →