2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Nov 2005


1. CONNECT NO. 1 WATER BY-PASS HOSE

  1. A127157
    Connect the 2 No. 1 water by-pass hoses to the throttle body assembly.


2. INSTALL THROTTLE BODY ASSEMBLY

  1. A127156
    Install a new O-ring.

  1. A127155E01
    Install the throttle body assembly with the 3 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf } for bolt A
    9.5 N*m{ 97 kgf*cm , 84 in.*lbf } for bolt B

  1. A127154
    Connect the connector to the throttle body assembly.


3. CONNECT CHARCOAL CANISTER FUEL HOSE

  1. A127153
    Connect the charcoal canister fuel hose to the throttle body assembly.


4. CONNECT NO. 2 VENTILATION HOSE

  1. A127152
    Connect the No. 2 ventilation hose to the throttle body assembly.


5. CONNECT NO. 1 WATER BY-PASS HOSE

  1. A127150
    Connect the 2 No. 1 water by-pass hoses.


6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }


7. ADD ENGINE COOLANT
  1. Tighten all the plugs.

  1. Disconnect the vinyl hose.

  1. Pour engine coolant into the radiator assembly until it overflows.

    Capacity:
    5.1 liters (5.4 USqts, 4.5 lmp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    1. Use of improper engine coolant may damage the engine coolant system.
    2. Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate engine coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

  1. Check the engine coolant level inside the radiator assembly by squeezing the inlet and outlet radiator hoses several times by hand. If the engine coolant level goes down, add engine coolant.

  1. Install the radiator cap sub-assembly securely.

  1. Slowly pour engine coolant into the radiator reservoir until it reaches the FULL line.

  1. Warm up the engine until the cooling fan operates.

    1. Set the air conditioning as follows while warming up the engine.

      Item
      Manual air conditioning system
      Automatic air conditioning system
      Set control as follows
      Fan speed - Any setting except "OFF"
      Temperature - Toward WARM
      Air conditioning switch "OFF"
      Fan speed - Any setting except "OFF"
      Temperature - To the highest temperature
      Air conditioning switch "OFF"
      "AUTO" switch "OFF"

    2. Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.

  1. Stop the engine and wait until the coolant cools down.

  1. If the engine coolant level is below the full level, perform steps (c) through (h) again and repeat the operation until the engine coolant level stays at the full level.

  1. Recheck the engine coolant level inside the radiator reservoir tank assembly. If it is below the full level, add engine coolant.


8. CHECK FOR ENGINE COOLANT LEAKAGE

CAUTION:
To avoid the danger of being burned, do not remove the radiator cap sub-assembly while the engine and radiator assembly are still hot. Thermal expansion will cause hot engine coolant and steam to blow out from the radiator assembly.

  1. A127379
    Fill the radiator assembly with engine coolant, then attach a radiator cap tester.

  1. Pump it to 137 kPa (1.4 kgf/cm2, 19.9 psi), then check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator assembly and water pump assembly for leakage. If there are no signs or traces of external engine coolant leakage, check the heater core, cylinder block and head.


9. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

  1. A127151
    Install a new O-ring.

  1. A127149
    Install the air cleaner case sub-assembly with the 3 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. A127148
    Connect the connector to the mass air flow meter.


10. INSTALL PURGE VSV ASSEMBLY

  1. A127147
    Install the bolt and install the purge VSV assembly.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


11. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

12. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

  1. A127144
    Install the air cleaner cap with the grommet and 2 clamps.

← INSPECTION (from Nov 2005)COMPONENTS (from Nov 2005) →