INSTALLATION
Removal / installation · Vehicles built from Nov 2006
| 1. INSTALL KNOCK SENSOR |
Install the knock sensor with the bolt as shown in the illustration.

- Torque:
- 21 N*m{ 214 kgf*cm , 16 ft.*lbf }
Connect the knock sensor connector.

| 2. INSTALL INTAKE MANIFOLD |
Install a new gasket onto the intake manifold.
Install the intake manifold and intake manifold stay with the 4 bolts and 2 nuts.

- Torque:
- 28 N*m{ 286 kgf*cm , 21 ft.*lbf }
Connect the water by-pass hose and the No. 2 water by-pass hose.

Connect the throttle body assembly connector.

Connect the ventilation hose.

Connect the 4 wire harness clamps.

| 3. INSTALL ENGINE OIL LEVEL DIPSTICK |
| 4. INSTALL STARTER ASSEMBLY |
Install the starter assembly with the 2 bolts.

- Torque:
- 37 N*m{ 377 kgf*cm , 27 ft.*lbf }
Connect the connector.

Connect terminal 30 with the nut.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
Close the terminal cap.
| 5. INSTALL INJECTOR VIBRATION INSULATOR |
Install 4 new injector vibration insulators onto the cylinder head.

| 6. INSTALL NO. 1 DELIVERY PIPE SPACER |
Install the 2 No. 1 delivery pipe spacers onto the cylinder head.

- NOTICE:
- Install the No. 1 delivery pipe spacers in the correct direction.
| 7. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY |
Install the fuel delivery pipe with the 4 fuel injectors, then provisionally install the 3 bolts.

- NOTICE:
- Do not drop the fuel injectors when installing the fuel delivery pipe.
- Do not drop the fuel injectors when installing the fuel delivery pipe.
- Check that the fuel injectors rotate smoothly after installing the fuel delivery pipe.
- Check that the fuel injectors rotate smoothly after installing the fuel delivery pipe.
Tighten the 3 bolts to the specified torque.
- Torque:
- 21 N*m{ 214 kgf*cm , 16 ft.*lbf }
| 8. CONNECT FUEL TUBE SUB-ASSEMBLY |
Insert the fuel tube connector into the fuel pipe until a click sound can be heard.

- NOTICE:
- Check that there are no scratches or foreign matter around the disconnected parts of the fuel tube connector and pipe before performing this work.
- Check that there are no scratches or foreign matter around the disconnected parts of the fuel tube connector and pipe before performing this work.
- After connecting the fuel tube, check that the fuel tube connector and pipe are securely connected by pulling them.
- After connecting the fuel tube, check that the fuel tube connector and pipe are securely connected by pulling them.
| 9. INSTALL FUEL PIPE CLAMP |
Install the fuel pipe clamp.

| 10. CONNECT VACUUM HOSE |
Connect the vacuum hose.

| 11. CONNECT NO. 1 FUEL VAPOR FEED HOSE |
Connect the No. 1 fuel vapor feed hose.

| 12. INSTALL HARNESS BRACKET |
Install the 2 harness brackets with the 2 bolts.

- Torque:
- 13 N*m{ 130 kgf*cm , 9 ft.*lbf }
| 13. INSTALL ENGINE WIRE HARNESS |
Connect the 4 wire harness clamps shown in the illustration.

| 14. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE |
Install air cleaner cap sub-assembly with hose and lock the 2 clamps.
Tighten the hose clamp to the specified torque.

- Torque:
- 3.0 N*m{ 31 kgf*cm , 27 in.*lbf }
Connect the No. 2 ventilation hose.

Connect the wire harness clamp and mass air flow meter connector.

| 15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
| 16. ADD ENGINE COOLANT |
Tighten all the plugs.
Pour engine coolant into the radiator assembly until it is completely full.
- Capacity:
- 5.0 liters (5.3 USqts, 4.4 lmp. qts)
- NOTICE:
- Do not substitute water for engine coolant.
- HINT:
- Use of improper engine coolant may damage the engine coolant system.
- Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate engine coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
- Use of improper engine coolant may damage the engine coolant system.
Check the engine coolant level inside the radiator assembly by squeezing the inlet and outlet radiator hoses several times by hand. If the engine coolant level goes down, add engine coolant.
Install the radiator cap sub-assembly securely.
Slowly pour engine coolant into the radiator reservoir until it reaches the FULL line.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens.
While the thermostat is open, circulate the coolant for several minutes.- HINT:
- The thermostat open timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.
Maintain the engine speed at 2500 to 3000 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
- CAUTION:
- When pressing the radiator hoses:
- Wear protective gloves.
- Be careful as the radiator hoses are hot.
- Keep your hands away from the radiator fan.
- Wear protective gloves.
Stop the engine and wait until the coolant cools down.
If the engine coolant level is below the full level, perform steps (b) through (g) again and repeat the operation until the engine coolant level stays at the full level.
Recheck the engine coolant level inside the radiator reservoir tank assembly. If it is below the full level, add engine coolant.
| 17. INSPECT FOR COOLANT LEAK |
- CAUTION:
- To avoid the danger of being burned, do not remove the radiator cap sub-assembly while the engine and radiator assembly are still hot. Thermal expansion will cause hot engine coolant and steam to blow out from the radiator assembly.
Fill the radiator assembly with engine coolant, then attach a radiator cap tester.

Pump the tester to 137 kPa (1.4 kgf/cm2, 19.9 psi), then check that the pressure does not drop.
If the pressure drops, check the hoses, radiator assembly and water pump assembly for leakage. If there are no signs or traces of external engine coolant leakage, check the heater core, cylinder block and head.
| 18. INSPECT FOR FUEL LEAK |
Connect the intelligent tester to the DLC3.
Turn the ignition switch on (IG) and the intelligent tester main switch ON.
- NOTICE:
- Do not start the engine.
Select the following menu items: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump /Speed.
Check that there is no fuel leakage anywhere in the fuel system after doing maintenance.
| 19. INSTALL NO. 2 CYLINDER HEAD COVER |
Disengage the 4 fittings shown and install the No. 2 cylinder head cover by applying pressure to it.

- HINT:
- Make sure that the oil and the engine oil level dipstick are correctly installed before installing the No. 2 cylinder head cover.
| 20. INSTALL ENGINE UNDER COVER RH |
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
| 21. INSTALL ENGINE UNDER COVER LH |
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
