OUTPUT SHAFT > DISASSEMBLY |
| 1. INSPECT 1ST GEAR THRUST CLEARANCE |
![]() |
Using a feeler gauge, measure the 1st gear thrust clearance.
| 2. INSPECT 2ND GEAR THRUST CLEARANCE |
![]() |
Using a dial gauge, measure the 2nd gear thrust clearance.
| 3. INSPECT 1ST GEAR RADIAL CLEARANCE |
![]() |
Using a dial gauge, measure the 1st gear radial clearance between the gear and shaft.
| 4. INSPECT 2ND GEAR RADIAL CLEARANCE |
![]() |
Using a dial gauge, measure the 2nd gear radial clearance between the gear and shaft.
| 5. REMOVE 4TH DRIVEN GEAR |
![]() |
Using SST and a press, remove the output shaft rear bearing and 4th driven gear from the output shaft.
| 6. REMOVE OUTPUT GEAR SPACER |
![]() |
Remove the output gear spacer from the output shaft.
| 7. REMOVE 2ND GEAR |
![]() |
Using SST and a press, remove the 3rd driven gear with 2nd gear from the output shaft.
| 8. REMOVE 2ND GEAR NEEDLE ROLLER BEARING |
![]() |
Remove the 2nd gear needle roller bearing and 2nd gear bearing spacer from the output shaft.
| 9. REMOVE SYNCHRONIZER RING NO.1 (FOR 2ND GEAR) |
![]() |
Remove synchronizer ring No. 1 from the output shaft.
| 10. REMOVE 1ST GEAR |
![]() |
Using 2 screwdrivers and a hammer, remove the clutch hub No. 1 shaft snap ring from the output shaft.
![]() |
Using SST and a press, remove the clutch hub No. 1 assembly and 1st gear from the output shaft.
| 11. REMOVE SYNCHRONIZER RING GEAR NO.1 (FOR 1ST GEAR) |
![]() |
Remove synchronizer ring No. 1 from the 1st gear.
| 12. REMOVE 1ST GEAR NEEDLE ROLLER BEARING |
![]() |
Remove the 1st gear needle roller bearing from the output shaft.
| 13. REMOVE 1ST GEAR THRUST WASHER |
![]() |
Remove the 1st gear thrust washer from the output shaft.
| 14. REMOVE 1ST GEAR THRUST WASHER PIN OR BALL |
![]() |
Remove the 1st gear thrust washer pin or ball from the output shaft.
| 15. REMOVE REVERSE GEAR |
![]() |
Remove the reverse gear, 3 synchromesh shifting keys and 3 synchromesh shifting key springs from transmission clutch hub No. 1.