Home › ENGINE · 1NZ-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSPECTION

for Preparation Click here



1. INSPECT PURGE VSV


A117810E01
  1. Check the resistance.

    1. Using an ohmmeter, measure the resistance between the terminals.

      Standard resistance:
      Tester Connection
      Specified Condition
      1 - 2
      26 to 30 Ω at 20°C (68°F)

      If the resistance is not as specified, replace the purge VSV.



    A117811E01
  1. Check the operation.

    1. Check that air does not flow from port E to F.



    2. A117812E01
    3. Apply battery voltage across the terminals.

    4. Check that air flows from port E to F.
      If the operation is not as specified, replace the purge VSV.