Home › ENGINE ยท 2NZ-FE › STARTING › INTEGRATION RELAY

INTEGRATION RELAY > INSTALLATION

for Preparation Click here



1. INSTALL INTEGRATION NO.1 RELAY
  1. Connect the 3 connectors.

  1. Attach the integration relay to the engine room relay block.



2. INSTALL RELAY BLOCK COVER NO. 1


B108189E01
  1. Insert the stopper of the instrument panel box from the cutout of the instrument panel lower.

  1. Engage the 2 hinges with the instrument panel open.

  1. Close the instrument panel box.



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }