Home › ENGINE · 2NZ-FE › COOLING › INTEGRATION RELAY

INTEGRATION RELAY > INSPECTION

for Preparation Click here



1. INSPECT INTEGRATION NO.1 RELAY


A125205E01
  1. Inspect the cooling fan relay.

    1. Using an ohmmeter, measure the resistance between the terminals.

      Standard resistance:
      Terminals
      Specified condition
      B5 - B8
      10 kΩ or higher
      B5 - B8
      Below 1 Ω
      (Apply battery voltage between terminals B6 and B7)

      NOTICE:
      While using the battery for the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.