CYLINDER HEAD > REPLACEMENT |
| 1. REMOVE INTAKE VALVE GUIDE BUSH |
![]() |
Heat the cylinder head to 80 to 100°C (176 to 212°F).
![]() |
Using SST and a hammer, tap out the guide bushing.
| 2. REMOVE EXHAUST VALVE GUIDE BUSH |
Heat the cylinder head to 80 to 100°C (176 to 212°F).
Using SST and a hammer, tap out the guide bushing.
| 3. INSTALL INTAKE VALVE GUIDE BUSH |
![]() |
Using a caliper gauge, measure the bushing bore diameter of the cylinder head.
| Bushing bore diameter mm (in.) | Bushing size |
| 9.685 to 9.706 (0.3813 to 0.3821) | STD |
| 9.735 to 9.755 (0.3833 to 0.3841) | O/S 0.05 |
Heat the cylinder head to 80 to 100°C (176 to 212°F).
![]() |
Using SST and a hammer, tap a new guide bushing in to the specified protrusion height.
![]() |
Using a sharp 5 mm reamer, ream the guide bushing to obtain the standard oil clearance between the guide bushing and valve stem.
| 4. INSTALL EXHAUST VALVE GUIDE BUSH |
Using a caliper gauge, measure the bushing bore diameter of the cylinder head.
| Bushing bore diameter mm (in.) | Bushing size |
| 9.685 to 9.706 (0.3813 to 0.3821) | STD |
| 9.735 to 9.755 (0.3833 to 0.3841) | O/S 0.05 |
Heat the cylinder head to 80 to 100°C (176 to 212°F).
Using SST and a hammer, tap a new guide bushing in to the specified protrusion height.
Using a sharp 5 mm reamer, ream the guide bushing to obtain the standard oil clearance between the guide bushing and valve stem.