Home › ENGINE · 2NZ-FE › STARTING › ACC CUT RELAY

ACC CUT RELAY > INSPECTION

for Preparation Click here



1. INSPECT ACC CUT RELAY


A030519E02
  1. Check the resistance.

    1. Using an ohmmeter, measure the resistance between the terminals.

      Standard resistance:
      Tester Connection
      Specified Condition
      3 - 4
      Below 1 Ω
      10 kΩ or higher (when battery voltage applied to terminals 1 and 2)
      3 - 5
      Below 1 Ω (when battery voltage applied to terminals 1 and 2)
      10 kΩ or higher

      If the result is not as specified, replace the relay.