Home › Drivetrain ยท C54 MANUAL TRANSMISSION / TRANSAXLE › BACK-UP LIGHT SWITCH

BACK-UP LIGHT SWITCH > INSTALLATION

for Preparation Click here



1. INSTALL BACK UP LIGHT SWITCH ASSEMBLY
  1. Using SST, install the back up light switch assembly to the manual transaxle assembly with a new gasket.

    SST
    09817-16011  

    Torque:
    40 N*m{ 410 kgf*cm , 30 ft.*lbf }

  1. Connect the back up light switch connector.

  1. Install the 2 clamps and wire harness.



2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


C235550E01
  1. Install the control shift cable of transmission control cable assembly to the control cable bracket with a new clip B.

  1. Install the control shift cable of transmission control cable assembly to the manual transaxle assembly with the washer and clip A.



3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH NO. 1 AIR CLEANER HOSE
  1. Install the air cleaner cap sub-assembly with No. 1 air cleaner hose to the throttle body assembly with the 2 clamps.

  1. Tighten the hose clamp.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }

  1. Engage the wire harness clamp and install the wire harness to the vacuum switching valve assembly.

  1. Connect the vacuum switching valve assembly connector.

  1. Connect the mass air flow meter connector.

  1. Engage the 2 clamps and connect the wire harness to the air cleaner cap sub-assembly and vacuum switching valve assembly.

  1. Connect the No. 2 fuel vapor feed hose to the intake manifold.

  1. Install the fuel vapor feed hose to the No. 1 air cleaner hose.

  1. Connect the fuel vapor feed hose assembly to the vacuum switching valve assembly and No. 1 air cleaner hose.