THROTTLE BODY > INSTALLATION |
| 1. INSTALL THROTTLE BODY ASSEMBLY |
Install the new gasket from to the intake manifold.
Install throttle body assembly with the bolt and 3 nuts.
Install wire harness bracket with the nut.
Connect the throttle body assembly connector.
Engage the wire harness clamp and install the wire harness to the wire harness bracket.
Connect the water by-pass hose to the throttle body assembly.
Connect the No. 2 water by-pass hose to the throttle body assembly.
Install the water filter bracket with the 2 nuts.
| 2. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH NO. 1 AIR CLEANER HOSE |
Install the air cleaner cap sub-assembly with No. 1 air cleaner hose to the throttle body assembly with the 2 clamps.
Tighten the hose clamp.
Engage the wire harness clamp and install the wire harness to the vacuum switching valve assembly.
Connect the vacuum switching valve assembly connector.
Connect the mass air flow meter connector.
Engage the 2 clamps and connect the wire harness to the air cleaner cap sub-assembly and vacuum switching valve assembly.
Connect the No. 2 fuel vapor feed hose to the intake manifold.
Install the fuel vapor feed hose to the No. 1 air cleaner hose.
Connect the fuel vapor feed hose assembly to the vacuum switching valve assembly and No. 1 air cleaner hose.
| 3. ADD ENGINE COOLANT |
Tighten the cylinder block drain cock plug and the radiator drain cock plug.
Pour engine coolant into the radiator assembly until it is full.
Check the coolant level inside the radiator assembly by squeezing the No. 2 radiator hose and the No. 3 radiator hose several times by hand. If the coolant level goes down, add engine coolant.
Install the water filler cap sub-assembly securely.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens.
While the thermostat is open, circulate the coolant for several minutes.
Maintain the engine speed at 2500 to 3000 rpm.
Press the No. 2 radiator hose and No. 3 radiator hose several times by hand to bleed air.
Stop the engine and wait until the coolant cools down.
If the coolant level is below the full level, perform steps (b) through (g) again and repeat the operation until the coolant level stays at the full level.
Recheck the coolant level inside the radiator reservoir tank assembly. If it is below the full level, add coolant.
| 4. INSPECT FOR COOLANT LEAK |
![]() |
Fill the radiator assembly with engine coolant, then attach a radiator cap tester.
| *1 | Radiator Cap Tester |
Pump the tester to 137 kPa (1.4 kgf/cm2, 19.9 psi), then check that the pressure does not drop.
If the pressure drops, check the hoses, radiator assembly and water pump assembly for leakage. If there are no signs or traces of external engine coolant leakage, check the heater core, cylinder block and head.
| 5. PERFORM INITIALIZATION |
Turn the ignition switch to ON without operating the accelerator pedal.
Connect the intelligent tester to the DLC3 and clear the DTCs (Click here).
Start the engine and check that the MIL is not illuminated and that the idle speed is within the specified range when the A/C is switched off after the engine is warmed up.
| Transaxle | Switch Condition | Engine Idle Speed |
| Automatic Transaxle | A/C switched off | 650 to 750 rpm |
| Manual Transaxle | 600 to 700 rpm |
Enter the following menus: Powertrain / Engine and ECT / Data List / Throttle Sensor Volt %. Fully depress the accelerator pedal and check that the value is 60% or more.
Perform a road test and confirm that there are no abnormalities.