Item
|
Detecting
Condition
|
Possible
cause
|
Monitoring
Strategy
|
● Rationality
check
|
●
Open in battery circuit. ● Open in
control circuit. ● Short to ground in
control circuit ● Faulty
PCSV ● Faulty PCM
|
Threshold
value
|
● Lambda
controller : -0.06-0.06 ● Air mass
through idle control valve < 0.8kg/h (1.7637
lb/h)
|
Enable
Conditions
|
● During Idle
and vehicle standstill ● Coolant
temperature > > 70 degC(158 °F) ●
Altitude (model) < 2500 m ● Integrated
purge mass > 2grams ● Closed loop
control enabled
|
Diagnostic
Time
|
|
Fail
Safe
|
●
None
|
| 1. |
Connect scantool to Data Link
Connector(DLC). |
| 2. |
Warm up the engine to normal operating
temperature. |
| 3. |
Monitor the "EVAP.PURGE VALVE" parameter on
the scantool.

|
The data shown above is only for
reference and there may be a little difference
actually. |
Service standard
Idle : 0 %
1000~3000 rpm : 1.5 ~ 35
% |
| 4. |
Is parameter displayed within
specifications?

▶ Fault is intermittent caused by poor contact
in the sensor’s and/or PCM’s connector or was repaired and PCM
memory was not cleared.
Thoroughly check connectors for looseness,
poor connection, bending, corrosion,contamination,deterioration, or
damage. Repair or replace as necessary and then go to "Verification
of Vehicle Repair" procedure.

▶ Go to "W/Harness Inspection"
procedure. |
| 1. |
Evap. Leakage Test
Evaporative Emissions Systems (EVAP) Leak
Tests can be run by the Scan Tool. The tests are automated and
provide either a pass-fail result or directions to check for
DTCs.

| (1) |
Connect scantool to Data Link
Connector(DLC). |
| (2) |
Warm up the engine to normal operating
temperature. |
| (3) |
Perform "07 EVAP. LEAKAGE TEST"
mode |
| (4) |
Is DTC P0441 set again?

Go to "W/Harness Inspection"
procedure

Fault is intermittent caused by poor
contact in the sensor’s and/or PCM’s connector or was repaired
and PCM memory was not cleared. Thoroughly check connectors
for looseness, poor connection,bending, corrosion,
contamination, deterioration, or damage. Repair or replace as
necessary and go to "Verification vehicle Repair"
procedure | |
| TERMINAL & CONNECTOR
INSPECTION |
| 1. |
Many malfunctions in the electrical system are
caused by poor harness and terminals. Faults can also be caused by
interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination,deterioration, or
damage. |
| 3. |
Has a problem been found?

▶ Repair as necessary and go to "Verification
of vehicle Repair" procedure.

▶ Go to "Power Circuit inspection"
procedure. |
| 2. |
Disconnect PCSV sensor
connector. |
| 3. |
Ignition "ON" & Engine
"OFF" |
| 4. |
Measure voltage between terminal 1 of PCSV
harness connector and chassis ground.

|
| 5. |
Is measure voltage within
Specification?

▶ Go to "Control circuit insepction"
procedure.

▶ Open circuit or short circuit to chassis
ground between PCSV harness connector and battery power
circuit.
▶ Repair as necessary and then go to
"Verification of Vehicle Repair" procedure.
|
In case the voltage at terminal 1 of
PCSV is 0 V when PCSV is disconnected.
▶ Possible cause:Open or short circuit
in battery power line after fuse(15A
INJ) | |
| CONTROL CIRCUIT
INSPECTION |
| 1. |
Check for open in harness
| (2) |
Disconnect PCSV sensor
connector. |
| (3) |
Ignition "ON" & Engine
"OFF" |
| (4) |
Measure voltage between terminal 2 of
PCSV harness connector and chassis ground.

|
| (5) |
Is measure voltage within
Specification?

▶ Go to "Component Inspection"
procedure.

▶ Open circuit between PCSV harness
connector and PCM harness connector.
▶ Short circuit to chassis ground
between PCSV harness connector and PCM harness
connector.
▶ Repair as necessary and then go to
"Verification of Vehicle Repair" procedure.
|
In case the measured voltage is 0V
when checking control line
▶ Possible cause:If the measured
voltage indicates 0V,the problem is that control line is
open, so check the open circuit between terminal 46 of
PCM and terminal 2 of
PCSV | | |
| 1. |
Check Operation of PCSV
| (2) |
Disconnect valve connector and Remove
Purge Control Valve. |
| (3) |
Check that no air flows through
valve. |
| (4) |
Apply 12V and a ground to 1 and 2
terminals of the Purge Control Valve.(To sensor
side) |
| (5) |
Verify that air flows through
valve

|
| (6) |
Does Purge Control Valve work properly
?

▶ Substitute with a known-good PCM and
check for proper operation. If the problem is corrected,
replace PCM and then go to "Verification of Vehicle Repair"
procedure.

▶ Substitute with a known-good PCSV and
check for proper operation. If the problem is corrected,
replace PCSV and then go to "Verification of Vehicle Repair"
procedure.
|
The purpose of measuring injector
resistance is to find if the open circuit is in the
component.So,check the continuity between signal line
and ground
line. | | |
| VERIFICATION OF VEHICLE
REPAIR |
| 1. |
Monitor and record the Freeze Frame Data for
the Diagnostic Trouble Code (DTC) which has been
diagnosed. |
| 2. |
Using a Scantool, Clear the
DTCs. |
| 3. |
Operate the vehicle within conditions noted in
the freeze frame data or enable
conditions. |
| 4. |
Monitor that all rediness test have been
verified as "Complete" |
| 5. |
Are any DTCs present ?

▶ Go to the applicable troubleshooting
procedure.

▶ System is performing to specification at