Item
|
Detecting Condition
|
Possible cause
|
Monitoring Strategy
|
● Signal check Low
|
● Open in control circuit (pin
14) ● Charging system ● Faulty PCM
|
Threshold value
|
● Voltage : < 10V
|
Enable Conditions
|
● 120 sec after engine start
|
Diagnostic Time
|
● 0.2 sec
|
Fail Safe
|
● None
|
| 1. |
Connect scantool to Data Link
Connector(DLC). |
| 2. |
Warm up the engine to normal operating
temperature. |
| 3. |
Monitor the "Battery voltage" parameter on
the scantool.

|
The data shown above is only for
reference and there may be a little difference
actually. |
Specification
Engine stop : 11 ~ 13V
Idle : 12 ~
15V |
| 4. |
Is parameter displayed within
specifications?

▶ Fault is intermittent caused by poor
contact in the sensor’s and/or PCM’s connector or was repaired and
PCM memory was not cleared.Thoroughly check connectors for
looseness, poor connection, bending,
corrosion,contamination,deterioration, or damage. Repair or replace
as necessary and then go to "Verification of Vehicle Repair"
proceduredure.

▶ Go to "W/Harness Inspection"
procedure. |
| TERMINAL & CONNECTOR
INSPECTION |
| 1. |
Many malfunctions in the electrical system
are caused by poor harness and terminals. Faults can also be caused
by interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination,deterioration, or
damage. |
| 3. |
Has a problem been found?

▶ Repair as necessary and go to
"Verification of vehicle Repair" procedure.

▶ Go to "Power Circuit inspection"
procedure. |
| 1. |
Check for open in harness(control relay
power)
| (2) |
Disconnect the main
relay. |
| (3) |
Ignition "ON" & Engine
"OFF" |
| (4) |
Measure voltage between terminal 2 and
5 of main relay harness connector and chassis
ground.

|
| (5) |
Is measure voltage within
Specification?

▶ Go to "Check for open in
harness(main relay control) " as below.

▶ Check for open in power
harness.
▶ Repair as necessary and then go to
"Verification of Vehicle Repair" procedure.
|
In case the voltage at terminal
2 and 5 of main relay power line is 0V.
▶ Possible cause : Opne circuit
in main relay power line which goes to main relay
terminal 2 and 5 through PCM fuse(20A) in
E/C-J/BOX | | |
| 2. |
Check for open in harness(control relay
control)
| (2) |
Connect PCM
connector. |
| (3) |
Ignition "ON" & Engine
"OFF" |
| (4) |
Measure voltage between terminal 14 of
PCM harness connector and chassis ground.

|
| (5) |
Is measure voltage within
Specification?

▶ Go to "Component Inspection"
procedure.

▶ Check for open in control
harness.
▶ Repair as necessary and then go to
"Verification of Vehicle Repair"
procedure. | |
| 1. |
Check control relay
| (2) |
Disconnect the control
relay |
| (3) |
Apply 12V and a ground to 1 and 2
terminals of the control
relay |
| (4) |
Measure resistance between terminal 1
and 5 of relay connector(To sensor side)

|
| (5) |
Does each resistance indicate
continuity circuit?

▶ Substitute with a known-good PCM and
check for proper operation. If the problem is
corrected,replace PCM and then go to "Verification of Vehicle
Repair" procedure.

▶ Substitute with a known-good control
relay and check for proper operation. If the problem is
corrected, replace control relay and then go to "Verification
of Vehicle Repair"
procedure. | |
| VERIFICATION OF VEHICLE
REPAIR |
| 1. |
Monitor and record the Freeze Frame Data for
the Diagnostic Trouble Code (DTC) which has been
diagnosed. |
| 2. |
Using a Scantool, Clear the
DTCs. |
| 3. |
Operate the vehicle within conditions noted
in the freeze frame data or enable
conditions. |
| 4. |
Monitor that all rediness test have been
verified as "Complete" |
| 5. |
Are any DTCs present ?

▶ Go to the applicable troubleshooting
procedure.

▶ System is performing to specification at
this time. |

|