| 1. |
Drain the power steering fluid by
disconnecting the return hose (A).

|
| 2. |
Disconnect the pressure tube (B) from the
power steering oil pump (A) by loosening eye bolt.
Tightening
torque Nm (kgf·m, lb-ft):
55 ~ 65 (5.5 ~ 6.5, 40 ~
47)
|

|
| 3. |
Remove the bolt (A) connecting steering gear
to universal joint.
Tightening
torque Nm (kgf·m, lb-ft):
13 ~ 18 (1.3 ~ 1.8, 9.4 ~
13.0)
|

|
Keep the neutral-range to prevent the
damage of the clock spring inner cable when you handlethe
steering
wheel. | |
| 4. |
Remove the both front wheel & tire
assemblies. |
| 5. |
Loosen the Driveshaft castle nut, and then
remove the tie rod end (A) from the knuckle (B) by using a SST
09568-4A000.
Tightening
torque Nm (kgf·m, lb-ft):
24 ~ 34 (2.4 ~ 3.4, 17 ~
26)
|

|
| 6. |
Remove lower arm ball joint assembly bolts
(A).
Tightening
torque Nm (kgf·m, lb-ft):
100 ~ 120 (10 ~ 12, 72 ~
86)
|

|
| 7. |
Disconnect the stabilizer link (B) from the
strut assembly (A).
Tightening
torque Nm (kgf·m, lb-ft):
35 ~ 45 (3.5 ~ 4.5, 25 ~
33)
|

|
| 8. |
Repeat on the other
side. |
| 9. |
Remove the dust cover by loosening the bolts
(A).

|
| 10. |
Loosen the bolts (A), and then remove the heat
protector.

|
| 11. |
Remove the muffler mounting rubber
(A).

|
| 12. |
Remove the front and rear roll stopper bolt
(A, B).
Tightening
torque Nm (kgf·m, lb-ft):
50 ~ 65 (5.0 ~ 6.5, 36 ~
47)
|

|
| 13. |
Remove the sub-frame by loosening the bolts
and nuts (A).
Tightening
torque Nm (kgf·m, lb-ft):
95 ~ 120 (9.5 ~ 12.0, 69 ~
87)
|

|
| 14. |
Remove the rear rool stopper by loosening the
bolt.
Tightening
torque Nm (kgf·m, lb-ft):
50 ~ 60 (5.0 ~ 6.0, 36 ~
43)
|

|
| 15. |
Disconnect the pressure hose and return tube
& hose assembly from the valve body housing.

|
| 16. |
Remove the power steering gear box (A) by
loosening the mounting bolt (B).
Tightening
torque Nm (kgf·m, lb-ft):
60 ~ 80 (6.0 ~ 8.0, 43 ~
58)
|

|
|
Be sure to connect between a tube and a hose
as shown in the illustration. |

| 1. |
Installation is the reverse of
removal. |
| 2. |
After installation, bleed the power steering
system. |
| 3. |
Adjust the wheel alignment. (Refer to SS
group) |
| 1. |
Remove the tie rod end (B) from the tie rod
(A).

|
| 2. |
Remove the bellows band (A).

|
| 3. |
Remove the bellows clip (A).

|
| 4. |
Pull the bellows out toward the tie
rod.
|
Check for rust on the rack when the
bellows are
replaced. | |
| 5. |
Remove the feed tube (A) from the rack
housing.

|
| 6. |
While moving the rack slowly, drain the fluid
from the rack housing. |
| 7. |
Remove the tie rod (B) from the rack
(A).
|
Remove the tie rod (B) from the rack
(A), taking care not to twist the
rack. |

|
| 8. |
Remove the yoke plug locking nut
(A).

|
| 9. |
Remove the yoke plug (A) with a 14 mm
socket.

|
| 10. |
Remove the lock nut (D), yoke plug (C), rack
support spring (B)and rack support yoke (A) from the gear
box.

|
| 11. |
When the end of the circlip comes out of the
notched hole (B) of the housing rack cylinder (C), turn the rack
stopper (A) clockwise and remove the circlip.
|
Be careful not to damage the
rack. |

|
| 12. |
Remove the rack bushing and rack from the rack
housing. |
| 13. |
Remove the O-ring (A) from the rack bushing
(B).

|
| 14. |
Remove the oil seal (B) from the rack bushing
(A).

|
| 15. |
Remove the valve body from the valve body
housing with a soft hammer. |
| 16. |
Using the special tool, remove the oil seal
and ball bearing from the valve body
housing. |
| 17. |
Remove the oil seal and O-ring from the rack
housing.
|
Be careful not to damage the pinion
valve cylinder inside of the rack
housing. | |
| 18. |
Using the special tool (09573-21200,
09555-21000), remove the oil seal (A) from the rack
housing.
|
Be careful not to damage the rack
cylinder inside of the rack
housing. |

|
| INSPECTION AND ADJUSTMENT BEFORE
DISASSEMBLY |
Fix a brass plate or
aluminum plate for protection to the jaws of a vise and mount the gear box
(A) in a vise (B).
|
When mounting the gear box in a vise, let the
installation section of it be fixed to the jaws. If other section is
fixed the gear box may be damaged. |

TOTAL PINION PRELOAD
| 1. |
Rotate the pinion gear for approximately 4 to
6seconds for one rotation to measure the total pinion
preload.Standard value
Total pinion
preload :
0.6 ~ 1.3 N·m (0.06 ~ 0.13 kgf·m, 0.4 ~
1.0 lb-ft)
|
|
Measure the pinion preload through the
entire stroke of the rack. |

|
| 2. |
If the measured value is out of
specifications, first adjust the yoke plug (A), then recheck the
total pinion preload. |
| 3. |
If you adjust the yoke plug but do not obtain
the total pinion preload, check or replace the yoke plug
components. |
TIE ROD SWING RESISTANCE
| 1. |
Rotate the tie rod severely ten
times. |
| 2. |
Measure the tie rod (A) swing resistance with
a spring scale (B).
Standard value
Total rod swing resistance :
1.5 ~ 5 N·m (0.15 ~ 0.5 kgf·m, 1.1 ~ 3.6
lb-ft)
|

|
| 3. |
If the measured value exceeds the standard
value, replace the tie rod assembly.
|
Even if the measured value is below the
standardvalue, the tie rod that swings smoothly without
excessive play may be used. If the measured value is below
0.044 Nm (0.44kg·cm, 0.03 lb-ft) replace the tie
rod. | |
BELLOWS INSPECTION
| 1. |
Inspect the bellows for damage or
deterioration. |
| 2. |
Make sure the bellows are secured in the
correct position. |
| 3. |
If the bellows are defective, replace them
with new ones. |
| 1. |
Apply the specified fluid to the entire
surface of the rack oil seal.
|
| 2. |
Install the backup washer and oil seal (A) to
the specified position in the rack housing.

|
| 3. |
Apply the specified fluid to the entire
surface of the rack bushing oil seal.
|
| 4. |
Install the oil seal (A) in the rack bushing
(B).

|
| 5. |
Apply the specified fluid to the entire
surface of the O-ring and install it in the rack
bushing. |
| 6. |
Apply the specified grease to the rack
teeth.
Recommended
grease :
Multipurpose grease SAE J310a NLGI
No.2
|
|
Do not plug the vent hole (A) in the
rack with grease. |

|
| 7. |
Insert the rack (A) into the rack housing (B)
and install the rack bushing (C).

|
| 8. |
Using a special tool, install the oil seal and
the ball bearing in the valve body
housing. |
| 9. |
After applying the specified fluid and grease
to the pinion valve assembly (A), install it in the rack housing
assembly.

|
| 10. |
Install the rack support yoke (A), rack
support spring (B), yoke plug (C) and lock nut (D) in the order
shown in the illustration. Apply semi-drying sealant to the threaded
section of the yoke plug before installation.

|
| 11. |
Install the locking nut with a specified
torque, after adjusting the rack support york as following
instruction.
| (1) |
Place the rack in the center
position. |
| (2) |
Tighten the york plug with a specified
torque.
Specified torque Nm(kgf·m,lb-ft)
:
Manual 9 ~ 11(0.9 ~ 1.1,6.5 ~
7.9), Power 20(2,14.5)
| |
| (3) |
Reciprocate the rack slowly 5
times. |
| (4) |
Place the rack in the center position
again, and then loosen the york
plug. |
| (5) |
Tighten the york with a specified
torque, and turn at a certain degree in reverse.
Specified torque Nm(kgf·m,lb-ft)
:
Manual 4.5 ~ 6.5(0.45 ~ 0.65,3.25
~ 4.70),
Power 5 ~ 6(0.5 ~ 0.6,3.62 ~
4.34)
Reverse
angle :
25 ± 5 (Manual), 35
(Power)
| |
| (6) |
Tighten the yoke lock nut without moving
yoke plug.
Specified torque Nm(kgf·m,lb-ft)
:
Manual 40 ~ 50(4 ~ 5,28.9 ~
36.2),
Power 50 ~ 60(5 ~ 6,36.2 ~
43.4)
|

| |
| 12. |
Tighten the feed tube (A) to the specified
torque and install the mounting rubber using adhesive.
Tightening
torque :
25 ~ 30 Nm (2.5 ~ 3 kgf·m, 18.0 ~ 21.7
lb-ft)
|

|
| 13. |
Apply the specified grease to the bellows
mounting position (fitting groove) of the tie rod.

|
| 14. |
Install the new attaching band to the
bellows.
|
When the bellows are installed, a new
band must be
used. | |
| 15. |
Install the bellows in position, taking care
not to twist it. |
| 16. |
Temporarily install the tie rod (A) to the tie
rod end (B).

|
| 17. |
Check for total pinion preload.
Total ponion
preload :
0.6 ~ 1.3 Nm (6 ~ 13 kgf·cm, 0.4 ~ 1.0
lb-ft)
|

|
| INSPECTION AND ADJUSTMENT BEFORE
DISASSEMBLY |
Fix a brass plate or
aluminum plate for protection to the jaws of a vise and mount the gear box
(A) in a vise (B).
|
When mounting the gear box in a vise, let the
installation section of it be fixed to the jaws. If other section is
fixed the gear box may be damaged. |

TOTAL PINION PRELOAD
| 1. |
Rotate the pinion gear for approximately 4 to
6seconds for one rotation to measure the total pinion
preload.Standard value
Total pinion
preload :
0.6 ~ 1.3 N·m (0.06 ~ 0.13 kgf·m, 0.4 ~
1.0 lb-ft)
|
|
Measure the pinion preload through the
entire stroke of the rack. |

|
| 2. |
If the measured value is out of
specifications, first adjust the yoke plug (A), then recheck the
total pinion preload. |
| 3. |
If you adjust the yoke plug but do not obtain
the total pinion preload, check or replace the yoke plug
components. |
TIE ROD SWING RESISTANCE
| 1. |
Rotate the tie rod severely ten
times. |
| 2. |
Measure the tie rod (A) swing resistance with
a spring scale (B).
Standard value
Total rod swing resistance :
1.5 ~ 5 N·m (0.15 ~ 0.5 kgf·m, 1.1 ~ 3.6
lb-ft)
|

|
| 3. |
If the measured value exceeds the standard
value, replace the tie rod assembly.
|
Even if the measured value is below the
standardvalue, the tie rod that swings smoothly without
excessive play may be used. If the measured value is below
0.044 Nm (0.44kg·cm, 0.03 lb-ft) replace the tie
rod. | |
BELLOWS INSPECTION
| 1. |
Inspect the bellows for damage or
deterioration. |
| 2. |
Make sure the bellows are secured in the
correct position. |
| 3. |
If the bellows are defective, replace them
with new
ones. | |