| 1. |
Measure the pressure of high pressure line by
measuring voltage output between NO.1 and NO.2
terminals

|
| 2. |
Inspect the voltage value whether it is
sufficient to be regular value or not.
Voltage = 0.00878835 * Pressure +
0.037081095 [PSIA]
| |
| 3. |
If the measured voltage value is not
specification, replace the A/C pressure
transducer. |
| 1. |
Disconnect the negative (-) battery
terminal. |
| 2. |
Recover the refrigerant with a
recovery/charging station. (Refer to
HA-9) |
| 3. |
Remove the discharge line (A) & suction
line (B) for wide space.
TORQUE: 8~12N.m (0.8~1.2kgf.m,
5.8~8.7lbf.ft)
|

|
| 4. |
Disconnect A/C pressure transducer connector
(3P) (A).

|
| 5. |
Remove the bolt, then disconnect the
liquid/suction pipe (A) from the expansion valve.

|
| 6. |
Remove the A/C pressure transducer (B) while
holding on to the fitting block (A).

|
Take care that liquid & suction pipe
are not
bent. | |
| 7. |
Installation is the reverse order of
removal.
TORQUE: 10~12N.m (1.0~1.2kgf.m,
7.4~8.8lbf.ft)
| | |