
The fuel injector is a
solenoid valve used to supply the correct fuel quantity for optimum
combustion under varying speed and load conditions. The ECM/PCM regulates
fuel injection quantity by controlling the injection duration based on
load, speed, and (in closed-loop mode) HO2S feedback.
If there is Open in
injector #2 circuit, ECM/PCM sets DTC P0202.
Item
|
Detecting
Condition
|
Possible Cause
|
DTC
Strategy
|
| •
|
Circuit continuity check,
open | |
| •
|
Open or short to ground in power
circuit |
| •
|
Open in control
circuit |
|
Enable Conditions
|
|
Threshold Value
|
|
Diagnostic Time
|
|
MIL
ON Condition
|
|

Temperature
|
Resistance (Ω)
|
20°C
(68°F)
|
13.8 ~
15.2Ω
|


| 1. |
Connect scantool to DLC (Data Link
Cable). |
| 2. |
Warm up the engine to normal operating
temperature. |
| 3. |
Monitor "injector" parameter on
scantool.

|
| 4. |
Is the "Injector" parameter displayed
correctly?

▶ Fault is intermittent caused by poor contact
in the sensor’s and/or ECM’s connector or was repaired and ECM/PCM
memory was not cleared. Thoroughly check connectors for looseness,
poorconnection, ending, corrosion, contamination, deterioration, or
damage. Repair or replace asnecessary and go to "Verification of
Vehicle Repair" procedure.

▶ Go to "Terminal and Connector Inspection"
procedure. |
| TERMINAL AND CONNECTOR
INSPECTION |
| 1. |
Many malfunctions in the electrical system are
caused by poor harness and terminals. Faults can also be caused by
interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?

▶ Repair as necessary and go to "Verification
of vehicle Repair" procedure.

▶ Go to " Power Circuit Inspection "
procedure. |
| 2. |
Disconnect injector
connector. |
| 4. |
Measure voltage between terminal 1 of injector
harness connector and chassis ground.

|
| 5. |
Is the measured voltage within
specification?

▶ Go to "Control Circuit Inspection"
procedure.

▶ Repair or replace as necessary and then, go
to "Verification of Vehicle Repair"
procedure. |
| CONTROL CIRCUIT
INSPECTION |
| 2. |
Disconnect injector
connector. |
| 4. |
Measure voltage between terminal 2 of injector
harness connector and chassis ground.

|
| 5. |
Is the measured voltage within
specification?

▶ Go to "Component Inspection"
procedure.

▶ Repair or replace as necessary and then, go
to "Verification of Vehicle Repair"
procedure. |
| 1. |
Check injecotor resistance.
| (2) |
Disconnect injector
connector. |
| (3) |
Measure resistance between terminal 1
and 2 of injector connector.(Component Side)
Specification :
Temperature
|
Resistance
(Ω)
|
20°C (68°F)
|
13.8 ~
15.2Ω
|

|
| (4) |
Is the measured resistance within
specification?

▶ Substitute with a known - good ECM/PCM
and check for proper operation.
▶ If the problem is corrected, replace
ECM/PCM and go to "Verification of Vehicle Repair"
procedure.

▶ Substitute with a known - good
injector and check for proper operation.
▶ If the problem is corrected, replace
injector and go to "Verification of Vehicle Repair"
procedure. | |
| VERIFICATION OF VEHICLE
REPAIR |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Connect scan tool and select "Diagnostic
Trouble Codes(DTCs)" mode. |
| 2. |
Clear the DTCs and Operate the vehicle within
DTC Enable conditions in General
information. |
| 3. |
Are any DTCs present ?

▶ Go to the applicable troubleshooting
procedure.

▶ System is performing to specification at
this
time. |