The main relay voltage
is monitored for high or low voltage values that may indicate main relay,
main relay circuit, or engine electrical system malfunctions.
If ECM/PCM detects
malfunction in power supply system, ECM/PCM sets DTC P0560.
Item
|
Detecting
Condition
|
Possible Cause
|
DTC Strategy
|
|
|
Case1
|
Threshold
Value
|
| •
|
Signal Voltage < 0.5V & Engine
stall | |
Case1
|
Threshold
Value
|
| •
|
Time after engine start >
120s |
|
Enable
Conditions
|
|
Diagnostic Time
|
|
MIL ONCondition
|
|


| 1. |
Connect scantool to Data Link
Connector(DLC). |
| 2. |
Warm up the engine to normal operating
temperature. |
| 3. |
Monitor the "Main relay" parameters on the
scantool.

|
| 4. |
Are the parameters displayed
correctly?
|

|
▶ Fault is
intermittent caused by poor contact in the sensor’s and/or
ECM’s connector or wasrepaired and ECM/PCM memory was not
cleared. Thoroughly check connectors for looseness,
poorconnection, bending, corrosion, contamination,
deterioration, or damage. Repair or replace as necessary and
go to "Verification of vehicle Repair"
procedure.
|
|

|
▶ Go to
"Terminal and connector inspection"
procedure.
|
|
| Terminal And Connector
Inspection |
| 1. |
Many malfunctions in the electrical system are
caused by poor harness and terminals. Faults can also be caused by
interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?
|

|
▶ Repair as
necessary and go to "Verification of vehicle Repair"
procedure.
|
|

|
▶ Go to
"Main relay circuit inspection"
procedure.
|
|
| 2. |
Disconnect Main relay and Key
"ON". |
| 3. |
Measure the voltage between terminal 30 of
main relay harness connector and chassis
ground. |
| 4. |
Measure the voltage between terminal 86 of
main relay harness connector and chassis ground.

|
| 5. |
Is the measured voltage within
specification?
|

|
▶ Go to
"Control circuit inspection" procedure.
|
|

|
▶ Check the
fuse(ECU A 30A) between battery and main
relay. ▶ Repair Open in power
circuit and then go to "Verification of vehicle Repair"
procedure.
|
|
| Control Circuit
Inspection |
| 2. |
Disconnect main relay and ECM/PCM
connector. |
| 3. |
Measure the resistance between terminal 85 of
main relay harness connectorand terminal 9/C01-2 of ECM/PCM harness
connector. (AT) |
| 4. |
Measure the resistance between terminal 85 of
main relay harness connectorand terminal 22/C01 of ECM/PCM harness
connector. (MT
Specification
: Approx 1Ω
|

|
| 5. |
Is the measured resistance within
specification?
|

|
▶ Go to
"Power supply circuit inspection" procedure.
|
|

|
▶ Repair
Open in control circuit and then go to "Verification of
vehicle Repair"
procedure.
|
|
Power Supply Circuit Inspection
| 2. |
Disconnect main relay and ECM/PCM
connector. |
| 3. |
Measure the resistance between terminal 87 of
main relay harness connectorand terminal 6/C01-1 of ECM/PCM harness
connector. (AT)
Measure the resistance between terminal 87 of
main relay harness connectorand terminal 6/C01 of ECM/PCM harness
connector.(MT)
Specification
: Approx 1Ω
|

|
| 4. |
Is the measured resistance within
specification?
|

|
▶ Go to
"System inspection" procedure.
|
|

|
▶ Repair
Open in power supply circuit and then go to "Verification of
vehicle Repair"
procedure.
|
|
| 1. |
Alternator circuit check
| (2) |
Disconnect alternator
connector. |
| (4) |
Measure the voltage between terminal
1/E01 of alternator harness connector and chassis
ground.
Measure the voltage between terminal
2/E02 of alternator harness connector and chassis
ground.

Specification : 10.5~11.5
V
|

|
| (5) |
Is the measured voltage within
specification ?

▶ Go to "Component inspection"
procedure.

▶ In case the voltage is not stable at
terminal 1/E01, check Open circuit, Battery voltage and
Fuse(MAIN 120 A). And then go to "Verification of vehicle
Repair" procedure.
▶ In case the voltage is not stable at
terminal 2/E02, check Open circuit, MIL circuit and MIL
resistor. And then go to "Verification of vehicle Repair"
procedure. | |
| 2. |
Disconnect main
relay. |
| 3. |
Measure the resistance between terminal 30 and
87 of main relay. (Component side) |
| 4. |
Measure the resistance between terminal 85 and
86 of main relay. (Component side)
Specification :
Terminal
|
Power
Approval
|
30~87
|
NO
|
85~86
|
YES (Approx. 70 ~
120Ω)
|

|
| 5. |
Is the measured resistance within
specifications?

▶ Go to "Alternator Check"
procedure.

▶ Substitute with a known - good Main relay
and check for proper operation.
▶ If the problem is corrected, replace Main
relay and go to "Verification of Vehicle Repair"
procedure. |
| 6. |
Alternator check.
| (2) |
Check the tension of alternator
belt. |
| (3) |
Check corrosion, damage or looseness of
Battery terminal and Alternator
terminal. |
| (5) |
Operate electrical parts(Head lamp,
Defoger, etc). |
| (6) |
Measure the voltage at
2000rpm.
Specification : Approx 12.5V ~
14.5V
| |
| (7) |
Is the measured voltage within
specifications ?

▶ Substitute with a known - good ECM and
check for proper operation.
▶ If the problem is corrected, replace
ECM and go to "Verification of Vehicle Repair"
procedure.

▶ Substitute with a known - good
Alternator and check for proper operation.
▶ If the problem is corrected, replace
Alternator and go to "Verification of Vehicle Repair"
procedure. | |
| Verification Of Vehicle
Repair |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Connect scan tool and select "Diagnostic
Trouble Codes(DTCs)" mode. |
| 2. |
Clear the DTCs and Operate the vehicle within
DTC Enable conditions in General
information. |
| 3. |
Are any DTCs present ?
|

|
▶ Go to the
applicable troubleshooting procedure.
|
|

|
▶ System is
performing to specification at this
time.
|
|