The fuel injector is a
solenoid valve used to supply the correct fuel quantity for optimum
combustion under varying speed and load conditions. The ECM/PCM regulates
fuel injection quantity by controlling the injection duration based on
load, speed, and (in closed-loop mode) HO2S feedback.
If there is Short to
battery in injector #1 circuit, ECM/PCM sets DTC P0262.
Item
|
Detecting
Condition
|
Possible Cause
|
DTC
Strategy
|
| •
|
Circuit continuity check,
high | |
| •
|
Short to power in control
circuit |
|
Enable Conditions
|
|
Threshold Value
|
|
Diagnostic Time
|
|
MIL
ON Condition
|
|
Temperature
|
Resistance (Ω)
|
20°C
(68°F)
|
13.8 ~
15.2Ω
|



When the ECM/PCM
energizes the injector by grounding the control circuit, the circuit
voltage will drop (theoretically 0V)and fuel is injected.
When the injector in
de-energized, the fuel injector is closed and the circuit voltage will
momentarily peak.
| 1. |
Connect scantool to DLC (Data Link
Cable). |
| 2. |
Warm up the engine to normal operating
temperature. |
| 3. |
Monitor "injector" parameter on
scantool.

|
| 4. |
Is the "Injector" parameter displayed
correctly?
|

|
▶ Fault is
intermittent caused by poor contact in the sensor’s and/or
ECM’s connector or was repaired and ECM/PCM memory was not
cleared. Thoroughly check connectors for looseness,
poorconnection, ending, corrosion, contamination,
deterioration, or damage. Repair or replace asnecessary and go
to "Verification of Vehicle Repair"
procedure.
|
|

|
▶ Go to
"Terminal and Connector Inspection"
procedure.
|
|
| Terminal And Connector
Inspection |
| 1. |
Many malfunctions in the electrical system are
caused by poor harness and terminals. Faults can also be caused by
interference from other electrical systems, and mechanical or
chemical damage. |
| 2. |
Thoroughly check connectors for looseness,
poor connection, bending, corrosion, contamination, deterioration,
or damage. |
| 3. |
Has a problem been found?
|

|
▶ Repair as
necessary and go to "Verification of vehicle Repair"
procedure.
|
|

|
▶ Go to "
Control Circuit Inspection "
procedure.
|
|
| Control Circuit
Inspection |
| 2. |
Disconnect injector
connector. |
| 4. |
Measure voltage between terminal 2 of injector
harness connector and chassis ground.
Specification
: Approx. 3.5V
|

|
| 5. |
Is the measured voltage within
specification?
|

|
▶ Go to
"Component Inspection" procedure.
|
|

|
▶ Repair or
replace as necessary and then, go to "Verification of Vehicle
Repair"
procedure.
|
|
| 1. |
Check injecotor resistance.
| (2) |
Disconnect injector
connector. |
| (3) |
Measure resistance between terminal 1
and 2 of injector connector.(Component Side)
Specification :
Temperature
|
Resistance
(Ω)
|
20°C (68°F)
|
13.8 ~
15.2Ω
|

|
| (4) |
Is the measured resistance within
specification?
|

|
▶
Substitute with a known - good ECM/PCM and check for
proper operation. ▶ If the
problem is corrected, replace ECM/PCM and go to
"Verification of Vehicle Repair"
procedure.
|
|

|
▶
Substitute with a known - good injector and check for
proper operation. ▶ If the
problem is corrected, replace injector and go to
"Verification of Vehicle Repair"
procedure.
|
| |
| Verification Of Vehicle
Repair |
After a repair, it is
essential to verify that the fault has been corrected.
| 1. |
Connect scan tool and select "Diagnostic
Trouble Codes(DTCs)" mode. |
| 2. |
Clear the DTCs and Operate the vehicle within
DTC Enable conditions in General
information. |
| 3. |
Are any DTCs present ?
|

|
▶ Go to the
applicable troubleshooting procedure.
|
|

|
▶ System is
performing to specification at this
time.
|
|